NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 46 pages

Retrofitting HVAC report, NYC Ground Zero

Machine-extracted title · confidence 41%

New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.

NYC-WTC_000278790–000278835
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

• System changeover is required from heating to cooling during the intermediate seasons. • System may not be able to respond to drastic weather variations due to the temperature control required to protect boilers from low water temperature conditions and chillers from high temperature conditions. • Due to infiltration, malfunctioning outside air dampers, and other maintenance and operations problems, freeze-up of the unit’s coils may be a problem during the unoccupied temperature setback periods.

Temperature Control

Control sequences of operations are very flexible and include the following three basic control cycles defined as;

• Cycle I: 100 percent outdoor air is admitted for economy cooling during the occupied mode of operation. During warm-up the outside air damper is closed. • Cycle II: A minimum amount of outside air (20 to 50%) is admitted during the occupied mode of operation for heating and ventilating. The percentage of outdoor air is gradually increased, in response to a rise in space temperature. As additional space cooling is required, the heating valve is modulated close and the outside air damper is modulated to 100% open to provide economy cooling. During warm-up the outside air damper is closed. • Cycle III Except during the warm-up stage, a variable amount of outdoor air is admitted as needed to maintain a fixed temperature of air entering the building. This control, typically set at 55’Fto 6O'F, provides ventilating during the cooling mode of operation.

HVAC Retrofit Solutions

The present HVAC system configuration requires that the smoke purge system and the corridor HVAC systems function together to ensure the fire safety of the building. Therefore, the use of the existing central corridor air handlers to serve the classrooms to improve the outside air filtering is not considered to be a viable engineering solution.

The design intent shown on the design drawings, and described in Section 3, was verified at the school on Tuesday, February 19, 2002. Ceiling tiles were removed in representative areas to verify that the HVAC systems are installed as shown on the original design drawings.

Increase Air Filtration of Existing Unit Ventilators

The ability of the schools classroom's unit ventilator system to provide adequate “indoor air quality” and sufficient airborne particulate matter filtering is based on the United States Environmental Protection Agency (EPA) Particulate Matter (PM) promulgated health standards based on particulate matter with a diameter smaller than 2.5

A:\6_RetrofitHngHVAC_R.CascoM.doc

Page Al-3

CITY_21MC100_010274206 NYC-WTC_000278819

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278819Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →