The existing HVAC system consisting of two floor mounted unit ventilators with an outside air requirement of 525 cfm will be retrofitted with a program consisting of the following: Conversion of one of the two existing floor mounted unit ventilators to a fan coil unit and the elimination of the introduction of outside air by this unit. Installation of a new vertical unit ventilator having the following characteristics. Combination Hydronic Heating coil and Chilled water coil Supply air requirement of 1250 to 1500 cfm depending on classroom size. Outside air heating capability of 50% of design cfm Filtering: 2” OdorGuard III pre-filter and 12” cartridge after filter (95% efficiency at 1 micron) Variable speed fan motor with sufficient design static for the two system filters and supply cfm directly related to room temperature requirements. Demand ventilation control based on room CO levels. Economizer control capability (100% outside air free cooling) Barometric relief damper to insure proper room pressurization. LonMark controls system for future Direct Digital Control (DDC) interface The proposed system configuration is illustrated in Figure 1.
Installation of the Vertical Unit Ventilator (VUV) will require the blocking of one classroom window as shown in Picture 1. Return air is introduced at the bottom of the VUV and outside air is introduced near the middle utilizing the bottom window sash to accommodate the outside air louver. The mixed air would be filtered using the 2” OdorGuard III activated charcoal pre-filter for odor and Volitale organic chemicals (VOC) control. A dual direct drive centrifugal fan would provide the required design airflow and static pressure to blow through the heating/cooling coil and the 12” deep cartridge after filter. Supply air would be discharged at the top of the unit in a more efficient throw pattern than possible with the floor-mounted unit.
Typical Large Classroom (LOOP SF) The existing HVAC system consist of three floor mounted unit ventilators with an outside air requirement of 725 cfm. The retrofit program consist of the following: Conversion of two of the three existing floor mounted unit ventilators to fan coil units and the elimination of the introduction of outside air by these units. Removal and replacement of one existing unit with one new unit to a new vertical unit ventilator having the following characteristics. Combination Hydronic Heating coil and Chilled water coil
DOE00048139.DOC Appendix 1 - Page 23
CITY_21MC100_011284794
NYC-WTC_000453570
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000250253
ATC cost estimate letter for environmental services at six schools affected by 9/11.
16 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000250241
Laboratory report page with OCR-garbled content; appears to be environmental test results related to PS 89M.
16 shared non-person entities · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
32 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322244
Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.
22 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
27 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455806
Safety and health survey of a DOE office space and HVAC system following employee complaints at 52 Chambers Street.
9 shared non-person entities · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000236896
Draft protocol document outlining daily ambient air and dust sampling procedures for PS/IS 89 following the World Trade Center tragedy.
16 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000319809
Document describing MS/PS 85M occupancy and recovery operations related to WTC.
16 shared non-person entities · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385830
protocol for ambient air and dust sampling inside PS 89 Manhattan following WTC cleanup.
16 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000274908
Draft ambient air/dust sampling protocol for asbestos at Stuyvesant High School.
15 shared non-person entities · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
16 shared non-person entities · 1 shared topics · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385871
Ambient air and dust sampling protocol for High School for Leadership & [name] (M 894).
16 shared non-person entities · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322244
Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similar indexed content
NYC-WTC_000322244
Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.
Similar indexed content
NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
Similar indexed content
NYC-WTC_000455806
Safety and health survey of a DOE office space and HVAC system following employee complaints at 52 Chambers Street.
Similar indexed content
NYC-WTC_000236896
Draft protocol document outlining daily ambient air and dust sampling procedures for PS/IS 89 following the World Trade Center tragedy.