NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Amendments for WTC site project, 130 Liberty Street, 2008

Machine-extracted title · confidence 24%

Nova/AMENDMENTS document listing work descriptions and quantities.

NYC-WTC_000265842–000265845
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOVA DEVELOPMENT GROUP, INC 130 CEDAR STREET ACM QUANTITIES

REMAINING AMENDMENTS QUANTIES

Phase Wdrk Area Floor/Level Section of Floor Affected Surfaces SF LF Description of Work COMPLETE ADD DELETE ACM SQ. ACM LN. 3-B 8 12 Exterior Facades Ext Window Caulk 275 Full Containment 275 3-B 8 11 Entire-North Side VAT/Mastic 600 Full Containment 600 3-B 8 11 Electrical Closet Transite Panels 120 Full Containment 120 3-B 8 11 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-B 8 11 Electrical Closet Wire Insulation_______ 50 Full Containment 50 3-B 8 11 North Side Pipe Insulation_______ 4 Full Containment 4 3-B 8 11 Chase N. Bath Pipe Insulation_______ 50 Full Containment 50 3-B 8 11 Interior; All Surfaces IWTC Dust 25,385 Full Containment 25,385 3-B 8 11 Exterior Facades Ext. Window Caulk 275 Full Containment 275 3-B 8 10 Entire VAT/Mastic 8,500 Full Containment 8,500 3-B 8 10 Electrical Closet Transite Panels 120 Full Containment 120 3-B 8 10 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-B 8 10 Electrical Closet Wire Insulation 50 Full Containment 50 3-B 8 10 Chase N Bath Pipe Insulation_______ 50 Full Containment 50 3-B 8 10 Interior: All Surfaces WTC Dust 26 384 Full Containment 26,384 3-B a 10 Exterior Facades Ext. Window Caulk 275 Full Containment 275 3-C 9 Roof: Main Entire Roof Roof Membrane 7,184 Foam Method (ACRM) 7,184 3-C 9 Roof: Main Entire Roof Perimeter Tar/Flashing 806 Foam Method (ACRM) 806 3-C 9 Bulkheads Tank Room Roof Roof Membrane 658 I Foam Method (ACRM) 658 3-C 9 Bulkheads Tank Room Roof Perimeter Tar/Flashing 257 Foam Method (ACRM) 257 3-C 9 Bulkheads Exterior Elevation Bulkhead Tar/Flashing 6,200 Foam Method (ACRM) 6,200 3-C 9 Bulkheads Fan Room Roof Root Membrane 110 Foam Method (ACRM) 110 3-C 9 Bulkheads Fan Room Roof Perimeter Tar/Flashing 105 Foam Method (ACRM) 105 3-C 9 Bulkheads Elev. Mach. Rm. Roof Roof Membrane 293 Foam Method (ACRM) 293 3-C 9 Bulkheads Elev Mach. Rm. Roof Perimeter Tar/Flashing 171 Foam Method (ACRM) 171 3-C 9 12 Terraces Roof Membrane 300 Foam Method (ACRM) 300 o 3-C 9 12 Terraces Perimeter Tar/Flashing 275 Foam Method (ACRM) 275 3-C 9 11 Terraces Roof Membrane 267 Foam Method (ACRM) 267 3C 9 11 Terraces Perimeter Tar/Flashing 250 Foam Method (ACRM) 250 I 3-C 9 10 Terraces Roof Membrane 800 Foam Method (ACRM) 800 c m 3-C 9 10 Terraces___________ Perimeter Tar/Flashing 320 Foam Method (ACRM) 320 “0 9 Entire_____________ 8,000 3-D 10 VAT/Mastic_________ 8,000 Full Containment 3-D 10 9 Electrical Closet Transite Panels______ 120 Full Containment 120 o 3-D 10 9 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 20 3-D 10 9 Electrical Closet Wire Insulation Full Containment 50 CD 3-D 10 9 Chase N Bath______ Pipe Insulation_______ 50 Full Containment_____ 50 3-D 10 9 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 o 3-D 10 9 Exterior Facade_____ Ext. Window Caulk 275 Full Containment 275 > z 3-E 11 8 Entire VAT/Mastic 4,500 Full Containment 4,500 z 3-E 11 8 Electrical Closet Transite Panels 120 Full Containment 120 > 3-E 11 8 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 > 3-E 11 8 Electrical Closet Wire Insulation 50 Full Containment 50 3-E 11 8 Chase N Bath Pipe Insulation_______ 50 Full Containment 50 c 3-E 11 8 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 CD 3-E 11 8 Exterior Facade_____ Ext. Window Caulk 275 Full Containment 275 1^ 3-E 11 7 Entire-North Area VAT/Mastic_________ 1,600 Full Containment 1,600 o 3-E 11 7 Electrical Closet Transite Panels______ 120 Full Containment 120 o o 3-E 11 7 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 w 3-E 11 7 Electrical Closet Wire Insulation 100 Full Containment 100 o 3-E 11 7 Columns Column Plaster 400 Full Containment 400 co CD ro

NYC-WTC_000265843

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265843Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →