NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 56 pages

Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005

Machine-extracted title · confidence 100%

Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.

NYC-WTC_000125698–000125753

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125723
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 01/17/2005 01:42 17325653654 NOVA DEVELOPMENT GRP PAGE 06

COAST HAZ. MAT REMOVAl, INC Asbestos Abatement Contractor 494,E: 41 $treat, Paterson, NJ 07504 Phone: (973) 346-0022 Fax: (973) 346.4665

Roof Baallchead Entire Electrical Wire 1551) LF Full Containment Roof •Bulkhead Machine Room Electrical Panel 500 SF Variance Ground Floor Chase N. Bath ie Insulation 50 LF Full Contalnmcnl c3round Floor Electrical Closet Tranalte Panel 120 SIr Variance Ground Floor Fright Slay. Door Sealed Door Insulation 100 SP Full Cantalnrnettt ' Ground Floor Electrical Closet Wire Insulation . 50 LF Full Containment Ground Floor Entire Skim Coat Ceiling Plain 5000 SF Full Containment Total 8177& 5765

Abatement of Tranaite Panels, Wall Tar, Interior Door Caulking (1,877 sq, ft.) We shall comply with Pull Containment Procedure with Special Condition. We are requesting a variance from the following suh~eections:

Section i-81(m): Partial plasticization of the work area(s).

War ace 1. We shall comply with-all necessary regulation according to full containment procedure except: Partial plasticization of the work areas, where asbestos materials are locate on the wall as Transits Panels (Electrical Rooms) —1,240 SF Interior Door Caulking-2 SF Interior Walt Tar (Pump Room) — 35 SF Transite Panels (Machine Room) — 500 SF Sealed Door Insulation —100 SF 2. The walls surfaces not being abated and floor of the work area, shall be plasticized with two layers of 6-mil plastic sheeting. 3. The numbers of air changes per hour shall be increased to 6..

IV. Work Area: Second and Third Floor.

Second Floor Chase N. Bath Pipe Insulation 50 LF Variance TM & D Second Floor Electrical Closet Transite PenoT 120 S>F Variance T1,A & D

Chase Variance Variance

M Total - 1440 SF dt:

Abatement of lrensite panda and fire doors (440 s,f.) Abstelncs%t of pipe Insulation (216 Ln') We shall comply with attiichment TM and R.

NYC-WTC 000125723

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125723Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →