NYC-WTC_000125698–000125753Folder label: “130 CEDAR STREET”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document 01/1//2005 01:42 17325653654 NOVA DEVELOPMENT GRP PAGE 05
EAST COAST IIAZ MAT.REMOVAL,INC Asbestos Abatement Contractor 494 E. 41 Street, Paterson, NJ 07504 Phone: 1973) 345-0022 Fait; ,(973) 345.4605
Soctinn 1-41©. During abatement air sampling inside work area. Section 1-41(d): No post abatement clearance air monitoring. Section 1-81(m): Partial plasticization of the work area. Section 1-82(a) & 1-83(a). Remote decontamination facilities. Section 1 ,91.: No negatidc air. Work Prna. edur a. The remote worker/waste decontamination enclosure system, constructed in accordance with Attachment R, shall be erected at ground level, loading area. This unit shall be maintained in the work place for the duration of the abatement. b. Protection below the work area is required with plastic sheeting. Where space permits, the plastic sheeting shall cover the ground as per attachment EC. C. The scaffolding system around building will he erected, maintained, and operated In accordance with the appllcablo federal, state, city rules and regulations by General Contractor. d. All movable items from the ground beneath the work area will be relocate before asbestos abatement work start. e. , Restrict access to the ground beneath the work area shall be by erecting temporary Fencing or anba.4tos warning barrier tape at a 25-foot perimeter from the building. Only authorlyed personnel performing the work shall entry the work areas. E. Each abatement team shall be equipped with appropriate tools, raga, a portable supply of amended water, and a HLPA vacuum. After the ACM is adequately wetted, it shall be stripped using band tools, with the ACM being directly bagged or dropped into a poly and promptly bagged. Upon cotnpleiiOn of removal, each surface shall be HEPA vacuumed, and then wet• 'willed to remove any loose visible debris and coated with•a transparent encepsulant, g. Upon completion of the stripping at a location and' before moving to the next, the surfaces of the immediate work area shall be rendered free , f visible debris. Next, the plastic covering of the platform shall be carefully cleaned and secured, at the next work area. h. Prior to the completion of each shift. the single disposable bag will be brought over to the remote decontamination unit (wash room), where the bags shall be wetted down and placed Into an additional 6 mil disposable bag. The second disposable will be secured with water resistant duct tape, labeled and brought down to the waste container by means of a hoist, the put Into the waste container for storage until the completion of work. i. Upon completion of each work area and visual clearance, all Critical barriers be removed will
and disposed of as ACM and shall follow the same bag out sequence as mentioned above.
ITT. work Arew Basement, Ground Floor, Roof Bulkhead
Basemem Entire Wire Insulation 2150 IMF Full Containment Basement Entire Pi Insulation 19651LP Full Containment Basement Boiler . Boiler Insulation _ R_ 800 SF Full Containment Basement Pump Roorn Wall 'Perimeter Water Proof Tar 55 SI' Variance Basement "Boiler Room Door Interior Door.Caul 2 SF Variance Basement Electrloal Room Fsleutrteal Panel Board 1120 SF Variance • Basement Elevator Room Elevator Break Pads 500 SF , Full Containment
NYC-WTC 000125722
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
6 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
9 shared non-person entities · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
12 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123541
Invoice from Asbestos Removal Corp dated August 6, 2002 for roof cleanup services at 29 Broadway.
8 shared non-person entities · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100474
Billing statement from a contractor detailing charges for environmental cleanup and facade work.
6 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123194
Invoice for roof asbestos abatement work completed at 198 Broadway covering nearly 25,000 square feet.
6 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000116315
Invoice from Asbestos Removal Corp to NYC DEP detailing costs for roof cleanup at 300 Albany Street.
3 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128146
Project notification form submitted to DEP regarding asbestos work schedules at 80 Gold Street.
7 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121883
Invoice from Fiber Control Inc. dated September 25, 2002, regarding work at the 116 Chambers Street site.
4 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112570
Invoice detailing costs for asphalt and gravel roof cleanup operations at 63 Wall Street in June 2002.
5 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115082
Permit application submitted by Benjamin Kurzban & Son Inc. to the DEP for roof work at 205 Pearl Street.
6 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125069
A single-page record labeled for 130 Cedar Street with a unique NYC-WTC identifier.
Filed in the same folder
NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Filed in the same folder
NYC-WTC_000125073
General notes and requirements for demolition work at 130 Cedar Street including contractor qualifications.
Filed in the same folder
NYC-WTC_000125076
Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.