Mr RajapTan Radhakrlslman - NYC DEP
133-135 Greenwich Street Variance Request
Airtek Project 05.0701- Revised September 29,2005
Exterior:
We are requesting a variance from the following subsections to facilitate the decontamination of
the facade:
Section 1-810) No pre-cleaning of the work area(s)
Section 1-81(m) Partial plasticization of the work area(s)
Section 1-82(a) & 1-83(a) Remote decontamination facilities
Section 1-91 No negative air
Section 1-112(d) & 1-112(e) No 1s` & 2nd settling period and no 2nd & 3`d cleaning
The exterior of the building was decontaminated as a part of the NYC DEP Building Exterior
Cleaning Program following 9/11/01. Airtek's visual inspection of ga and roof indicates
that It is advisable to conduct low-pressure power washing prior toInitialing molition activities.
The exterior of the building will be cleaned in accordance with the WTC Dust/Residue
Roof & Façade Cleaning Procedures. ro
Interior:
Phase 1— Soft Strip:
We are requesting a variance from the following subsections:
Section 1-125(i) Isolation Barriers
We request relief from 1-125(i): Isolation Barriers. It is the intent of the project to seal all
windows and communicating openings to the outside of the building from the outside with two
layers of 6-mil poly and plywood barriers. The intent of this action Is to create a sealed structure
that will allow decontamination activities within the building while reducing the possibility of
migration of dust to the outside of the structure.
All interior materials, including moveable objects, will be subject to decontamination and
removal or, if porous, will be bagged and disposed of as ACM waste at a minimum. Additional
waste characterization will be conducted per Part IV Waste Management Plan. All ceiling
systems (plaster, tiles, sheetrock, etc.), wall systems (plaster, wall board, etc.), and floor
systems, (tiles, carpet, etc.) will be removed and bagged for disposal as ACM waste at a
minimum. Remaining structural members, pipes, boiler, freezer boxes and roof mounted HVAC
units will be wet-wiped, HEPA vacuumed, and encapsulated with a penetrating encapsuiant. All
interstitial spaces will be wet-wiped, HEPA-vacuumed, and encapsulated. Operable windows
will be articulated, wet wiped, HEPA-vacuumed, and encapsulated. Full worker and waste
decontamination facilities will be attached to the entrance on Thames Street. The
decontamination facilities will comply with NYC DEP Title 15 §1-82 & §1-83.
Phase 11- In Place Exterior ACM:
We are requesting a variance from the following subsections for the roofing materials:
Section 1-41(c) During abatement air sampling inside the work area
Section 1-41(d) No post abatement clearance air monitoring
Section 1-102(b) Not to fully saturate ACRM with amended water
We proposed to use Attachment FR - Procedures for use of Foam or Similar Viscous Liquid in
Removal of Asbestos Containing Roofing (ACRM) in New York City. In addition to the
conditions set forth In Attachment FR Section E-6 arrangements have been made to seal
openings at High School of Economics & Finance — Refer to Work Plan for details.
In-place ACM has been identified as follows: