NYC DEP ACP Fax:7185953648 Feb 28 2005 17:06 P.10
EAST COASTHAZ MAT REMOVAL, INC
Asbestos Abatement Contractor
• .494 E. 41 Street, Paterson, NJ 07504
Phone: (973) 345-0022
Fax: (973) 345-4665
Section 1-41®: During abatement air sampling inside work area.
Section 1-41(d): No post abatement clearance air monitoring.
Section 1-81(m): Partial plasticization of the work area.
Section 1-$2(a) & 1-83(a): Remote decontamination facilities.
Section 1-91: No negative air.
Work Procedures
a. The remote worker/waste decontamination enclosure system, constructed in accordance, with
Attachment R, shall be erected at ground level; loading area. This unit shall be maintained in the
work place for the duration of the abatement.
b. Protection below the work area is required with plastic sheeting. Where space permits, the
plastic sheeting shall cover the ground as per attachment EC.
c. The scaffolding system around building will be erected, maintained, and operated in accordance
with the applicable federal, state, city rules and regulations by General Contractor.
d. All movable items from the ground beneath the work area will be relocate before asbestos
abatement work start.
e. Restrict access to the ground beneath the work area shall be by erecting 'temporary fencing or
asbestos warning barrier tape at a 25-foot perimeter from the building. Only authorized
personnel performing the work shall entry the work areas.
f. Each abatement team shall be equipped with appropriate tools, rags, a portable supply of
amended water, and a HEPA vacuum. After the ACM is adequately wetted, it shall be stripped
using band tools, with the ACM being directly bagged or dropped into a poly and promptly
bagged. Upon completion of removal, each surface shall be HEPA vacuumed, and then wet-
wiped to remove any loose visible debris and coated with a transparent encapsulant.
g. Upon completion of the stripping at a location and before moving to the next, the surfaces of the
immediate work area shall be rendered free of visible debris. Next, the plastic covering of the
platform shall be carefully cleaned and secured, at the next work area.
h. Prior to the completion of each shift, the single disposable bag will be brought over to the
remote decontamination unit (wash room), where the bags shall be wetted down and placed into
an additional 6 rail disposable bag. The second disposable will be secured with water resistant
duct tape, labeled and brought down to the waste container by means of a hoist, the put into the
waste container for storage until the completion of work.'
i. Upon completion of each work area and visual clearance, all critical barriers will be removed
and disposed of as ACM and shall follow the same bag out sequence as mentioned above.
IM Work Area: Basement, Ground Floor, Roof Bullhead
Basement Entire Wire Insulation 2150 LF Full Containment
Basement Entire Pipe Insulation 1965 LF Full Containment
Basement. Boiler Boiler Insulation 800 SF Full Containment
Basenieni Pump Room Wall Perimeter Water Proof Tar. . 35 SF Variance
Basement 'Boiler Room Door Interior Door Caulking 2 SF Variance
Basement Electrical Room Electrical Panel Board 1120 SF Variance
Basement Elevator Room Elevator Break Pads 500 SF Full Containment
C]
NYC-WTC 000125085