NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 22 pages

Asbestos permit application correspondence, 130 Cedar Street, Feb 2005

Machine-extracted title · confidence 100%

Correspondence submitting updated asbestos project documentation to the DEP for 130 Cedar Street.

NYC-WTC_000125076–000125097

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125086
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYC DEP ACP Fax:7185953648 Feb 28 2005 17:06 P.11

EAST COAST I AZ`MAT BE OVAL,94C /beste Abatement Contractor 494 E 41 Street, Paterson, NJ 07504 Phone: (973) 345-0022 .Fax"• (973) 346-4065

Roof Bulkhead Entire Electrical Wire 1550 LF Full Containment Roof Bulkhead Machine Room Electrical Panel 500 SF Variance •Ground Floor Electrical Closet Transite Panel 120 SF Variance Ground Floor Fright Elev. Door Sealed Door Insulation 100 SF Full Containment Ground Floor Electrical Closet Wire Insulation 50 LF Full Containment Ground Floor Entire Skim Coat Ceiling Plastr 5000 SF Full Containment Total 8177 SF& 5715 LF

Abatement of T ansite Panels, Wall Tar, Interior Door Caulking (1,877 sq. ft.) We shall comply with Full Containment Procedure with Special Condition. We are requesting a variance from the following subsections:

Section 1=81(m): Partial plasticization of the work area(s).

Work Procedures 1. We shall comply with all necessary regulation according to full containment procedure except Partial plasticization of the work areas, where asbestos materials are locate on the wall as. Transite Panels (Electrical Rooms) —1,240 SF Interior Door Caulking'— 2 SF Interior Wall Tar (Pump Room) — 35 SF Transite Panels (Machine Room) — 500 SF Sealed Door Insulation —100 SF 2. The walls surfaces not being abated and floor of the work area, shall be plasticized with two layers of 6-mil plastic sheeting. 3. The numbers of air changes per hour shall be increased to 6.

IV. rd Floor.. Work Area: A. Second and Third B. All Floors (Ground, Floor Second throughout Twelve)

Work Area: A Second Floor Electrical Closet Transite Panel 120 SF Variance TM & D Second Floor Fright Elev. Door Sealed Door Insulation 100 SF Variance TM & D Second Floor Electrical Closet Wire Insulation 50 LF Variance TM & D Second Floor East Side Pipe Insulation 16 LF Variance TM & D Third Floor Electrical Closet Transite Panel 120 SF Variance TM & D Third. Floor Fright Elev. Door Sealed Door Insulation 100 SF Variance TM & D Third Floor Electrical Closet Wire Insulation 5012 Variance TM & D Total 440 SF & 116 LF

5

NYC-WTC 000125086

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125086Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →