NYC 9/11 Public Portal Document
LOCATION
FLOOR
10° Floor
11° Floor
12* Floor
Bulkhead
Basement
10# Floor -
Terraces
11* Floor-
Terraces
12t Floor-
Terraces
AREA
Electrical Closet
=
Elev. Machine Rm.
SE Corner Room
Large Room at SE
Electrical Room
Telephone Room
Sump Pump Room
Stair #2 Landing
North Center Room
Hallway.
NE Duct Room
North Terrace
South Terrace
North West Terrace
North East Terrace
South East Terrace
South West Terrace
North West Terrace
North East Terrace
South East Terrace
South West Terrace
Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
ACM TYPE
Electrical Wire Insulation
LAB RESULTS
Assumed ACM
=
Pipe & Fittings Insulation
Confirmed ACM
Roof Membrane
Roof Membrane
Assumed ACM
Assumed ACM
Assumed ACM
ACM QUANTITY AAT
NOTES
50 LF
50 LF
50 LF
1,500 LF
50 LF
400 LF
400 LF
30 LF
60 LF
25 LF
300 LF
400 LF
300 LF
1,280 SF
1,280 SF
120 SF
120
Assumed ACM
Remove pipe & pipe
fittings insulation.
Contractor
to
demolish pipe chase
in sump pump room
plenum
Assumed ACM
Remove with ACM
flashing seam tar and
perimeter flashing tar
at all Terraces
Roof Membrane
100 SF
100 SF
100 SF
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 68
NYC-WTC_000125646
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000125646Source: NYC Law Department, mirrored locally