e. constructed in compliance with the requirements of Attachment D. Decontamination units that
are attached to tents shall comprise at least'a shower room and a•clean room, with one curtained
.doorway separating them, and with a second curtained doorway separating the tent from the
shower room.
After the ACM removal and bagging, the bagged waste shall be HEPAvacuumed then wet
cleaned and transferred into the airlock or into the shower room for double. bagging, and
thereafter the double-bagged waste shall be transferred outside the clean room for its final transfer
to storage in a holding area and/or to legal means of disposal.
Additional Requirements for Work Area: B (Pipe Shaft)
Modified tents shall be constructed at the each entry to pipe shaft. An airlock shall.be
constructed at the entrance to every modified lent Remote decontamination unit shall be constructed
in the distance of maximum 50 linear feet from every modified tent. Large Personal and Waste .
decontamination unit shall be constructed and attached to modified tent at the ground floor level.
Minimum of one air volume change per 10 minutes through entire pipe shaft - modified tent shall be
maintained. Upon completion of removal, each surface shall be HEPA vacuumed, and then wet-wiped
to remove any loose visible debris and coated with a transparent encapsulant.
Prior to the completion of each shift, the single disposable bag will be brought over to the waste decon
unit (wash room), where the bags shall be wetted down and placed into an additional 6-mil disposable
bag. The second disposable will be secured with water resistant duct tape, labeled and brought down to
hhe waste container for storage until the completion of work.
Upon completion of entire pipe shaft work area and acceptable visual clearance, final air clearance
with TEM method shall be perform by independent monitoring company.
throughout Twelve Floors.
V. Work Area: Fourththroughout ..r u~
Fourth Floor Entire—North Area Floor Tile Mastic .1000 SF Variance VA
Fourth Floor Electrical Closet Transite Panel 120 SF Variance VA
Fourth Floor Fright Elev. Door Sealed Door Insulation 100 SF Variance VA
Fourth Floor Electrical Closet Wire Insulation 50 LF Variance VA
Total 1220 SF &
SOL'F
Fifth Floor South-East Area Floor Tile/Carpet Mastic 200 SF Variance VA
Fifth Floor Electrical Closet Transite Panel 1.20 SF Variance VA
Fifth Floor Fri ht Eiev. Door Sealed Door Insulation 100 SF Variance VA
Fifth Floor Electrical Closet Wire Insulation 100 LF Variance VA
Fifth Floor Entire Ceiling Skim Coat 2,900 SF Variance VA
Fifth Floor North-East Pipe Insulation ' 15 LF Variance VA
• Total 3320 SF &
115LF
Sixth Floor . Entire—North Area Floor Tile.Mastic 2700 SF Variance VA
Sixth Floor Electrical Closet Transits Panel - .120.SF Variance VA
Sixth Floor Fright Elev. Door Sealed Door Insulation . 100 SF Variance VA
Sixth Floor Electrical Closet 1 Wire Insulation .50 LF Variance VA