Amendments for WTC site project, 130 Liberty Street, 2008

Machine-extracted title · confidence 24%

Nova/AMENDMENTS document listing work descriptions and quantities.

NYC-WTC_000265842–000265845
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOVA DEVELOPMENT GROUP, INC, 130 CEDAR STREET ACM QUANTITIES

REMAINING AMENDMENTS QUANTIES

Phase Work Area Floor/Level Section of Floor Affected Surfaces SF LF Description of Work COMPLETE ADD DELETE ACM SQ. ACM LN. 3-E 11 7 Ceiling___________ Acoustical Ceiling Skim Plaster 1,500 Full Containment 1,500 3-E 11 7 Northeast Area Pipe Insulation______________ 123 Full Containment 123 3-E 11 7 Chase N. Bath Pipe Insulation______________ 100 Full Containment 100 3-E 11 7 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 3-E 11 7 Exterior Facade Ext. Window Caulk 275 Full Containment 275 3-F 12 6 Entire-North Area VAT/Mastic 2,700 Full Containment 2,700 3-F 12 6 Electrical Closet Transite Panels 120 Full Containment 120 3-F 12 6 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-F 12 6 Electrical Closet Wire Insulation 50 Full Containment 50 3-F 12 6 Center Pipe Insulation______________ 218 Full Containment 218 3-F 12 6 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 3-F 12 6 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,226 3-F 12 6 Exterior Facade Ext. Window Caulk 275 Full Containment 275 3-F 12 5 Southeast Area VAT/Mastic 200 Full Containment 200 3-F 12 5 Electrical Closet Transite Panels 120 Full Containment 120 3-F 12 5 Freight Elev Door Sealed Door Insulation 100 Full Containment 100 3-F 12 5 Electrical Closet Wire Insulation 100 Full Containment 100 3-F 12 5 Entire Acoustical Ceiling Skim Plaster 2,900 Full Containment 2,900 3-F 12 5 NorthEast Area Pipe Insulation______________ 15 Full Containment 15 3-F 12 5 Chase N. Bath Pipe Insulation_____________ _ 100 Full Containment 100 3-F 12 5 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 3-F 12 5 Exterior Facade Ext. Window Caulk 275 Full Containment 275 3-G 13 4 Entire-North Area VAT/Mastic 4,094 Full Containment 4,094 3-G 13 4 Electrical Closet Transite Panels 120 Full Containment 120 3-G 13 4 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-G 13 4 Electrical Closet Wire Insulation 50 Full Containment 50 O 3-G 13 4 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 3-G 13 4 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 3-G 13 4 Exterior Fapade Ext. Window Caulk — 275 Full Containment 275 O 3-G 13 3 Electrical Closet Transite Panels 120 Full Containment 120 m 3-G 13 3 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-G 13 3 Electrical Closet Wire Insulation______________ 50 Full Containment 50 3-G 13 3 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 O 3-G 13 3 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 20 3-G 13 3 Exterior Facade Ext. Window Caulk 275 Full Containment 275 00 3-H 14 2 Electrical Closet Transite Panels 120 Full Containment 120 3-H 14 2 _Frei2h£Eley;_Doo^ Sealed Door Insulation 100 Full Containment 100 o 3-H 14 2 Electrical Closet Wire Insulation 50 Full Containment 50 > 3-H 14 2 East Side Pipe Insulation______________ 16 Full Containment 16 3-H 14 2 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 5 3-H 14 2 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228

£c 00 3-H 3-1 3-1 14 15 15 2 1 1 Exterior Farrade Northern Half Electrical Closet Ext. Window Caulk__________ Acoustical Ceiling Skim Plaster Transite Panels 275 • 3,836 120 Full Containment Full Containment Full Containment 275 3,836 120 3-1 15 1 Freight Eley. Door Sealed Door Insulation 100 Full Containment 100 3-1 15 1 Electrical Closet Wire Insulation Full Containment 50 o o 3-1 15 1 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 o 3-1 15 1 Northern Half WTC Dust 13,546 Full Containment 13,546 co 3-1 15 1 N. Ext. Facade Ext. Window Caulk ■ 137 Full Containment 137 o co 3-J 16 Bulkheads Elev. Mach. Rm Transite Panels 500 Full Containment 500 I 00 co

NYC-WTC_000265844

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000265844Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →