NYC-WTC_000265842–000265845OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NOVA DEVELOPMENT GROUP, INC, 130 CEDAR STREET ACM QUANTITIES
REMAINING AMENDMENTS QUANTIES
Phase Work Area Floor/Level Section of Floor Affected Surfaces SF LF Description of Work COMPLETE ADD DELETE ACM SQ. ACM LN. 3-E 11 7 Ceiling___________ Acoustical Ceiling Skim Plaster 1,500 Full Containment 1,500 3-E 11 7 Northeast Area Pipe Insulation______________ 123 Full Containment 123 3-E 11 7 Chase N. Bath Pipe Insulation______________ 100 Full Containment 100 3-E 11 7 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 3-E 11 7 Exterior Facade Ext. Window Caulk 275 Full Containment 275 3-F 12 6 Entire-North Area VAT/Mastic 2,700 Full Containment 2,700 3-F 12 6 Electrical Closet Transite Panels 120 Full Containment 120 3-F 12 6 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-F 12 6 Electrical Closet Wire Insulation 50 Full Containment 50 3-F 12 6 Center Pipe Insulation______________ 218 Full Containment 218 3-F 12 6 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 3-F 12 6 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,226 3-F 12 6 Exterior Facade Ext. Window Caulk 275 Full Containment 275 3-F 12 5 Southeast Area VAT/Mastic 200 Full Containment 200 3-F 12 5 Electrical Closet Transite Panels 120 Full Containment 120 3-F 12 5 Freight Elev Door Sealed Door Insulation 100 Full Containment 100 3-F 12 5 Electrical Closet Wire Insulation 100 Full Containment 100 3-F 12 5 Entire Acoustical Ceiling Skim Plaster 2,900 Full Containment 2,900 3-F 12 5 NorthEast Area Pipe Insulation______________ 15 Full Containment 15 3-F 12 5 Chase N. Bath Pipe Insulation_____________ _ 100 Full Containment 100 3-F 12 5 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 3-F 12 5 Exterior Facade Ext. Window Caulk 275 Full Containment 275 3-G 13 4 Entire-North Area VAT/Mastic 4,094 Full Containment 4,094 3-G 13 4 Electrical Closet Transite Panels 120 Full Containment 120 3-G 13 4 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-G 13 4 Electrical Closet Wire Insulation 50 Full Containment 50 O 3-G 13 4 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 3-G 13 4 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 3-G 13 4 Exterior Fapade Ext. Window Caulk — 275 Full Containment 275 O 3-G 13 3 Electrical Closet Transite Panels 120 Full Containment 120 m 3-G 13 3 Freight Elev. Door Sealed Door Insulation 100 Full Containment 100 3-G 13 3 Electrical Closet Wire Insulation______________ 50 Full Containment 50 3-G 13 3 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 O 3-G 13 3 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228 20 3-G 13 3 Exterior Facade Ext. Window Caulk 275 Full Containment 275 00 3-H 14 2 Electrical Closet Transite Panels 120 Full Containment 120 3-H 14 2 _Frei2h£Eley;_Doo^ Sealed Door Insulation 100 Full Containment 100 o 3-H 14 2 Electrical Closet Wire Insulation 50 Full Containment 50 > 3-H 14 2 East Side Pipe Insulation______________ 16 Full Containment 16 3-H 14 2 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 5 3-H 14 2 Interior: All Surfaces WTC Dust 29,228 Full Containment 29,228
£c 00 3-H 3-1 3-1 14 15 15 2 1 1 Exterior Farrade Northern Half Electrical Closet Ext. Window Caulk__________ Acoustical Ceiling Skim Plaster Transite Panels 275 • 3,836 120 Full Containment Full Containment Full Containment 275 3,836 120 3-1 15 1 Freight Eley. Door Sealed Door Insulation 100 Full Containment 100 3-1 15 1 Electrical Closet Wire Insulation Full Containment 50 o o 3-1 15 1 Chase N. Bath Pipe Insulation______________ 50 Full Containment 50 o 3-1 15 1 Northern Half WTC Dust 13,546 Full Containment 13,546 co 3-1 15 1 N. Ext. Facade Ext. Window Caulk ■ 137 Full Containment 137 o co 3-J 16 Bulkheads Elev. Mach. Rm Transite Panels 500 Full Containment 500 I 00 co
NYC-WTC_000265844
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000417294
Testing mechanics/chain-of-custody form with laboratory reference; building WTC-related.
Similar document embedding; no shared entity or topic indexed. · similarity 0.877
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125698
Cover sheet and comments regarding DEP variance approval for exterior facade cleaning at 130 Cedar Street dated January 14, 2005.
1 shared non-person entities · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125076
Fax transmission regarding updated asbestos project submittals and requested changes for the 130 Cedar Street permit application.
1 shared non-person entities · 1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
1 shared non-person entities · 1 shared topics · similarity 0.891
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Formal notification document for an asbestos project including submission instructions and official use fields.
1 shared non-person entities · 1 shared topics · similarity 0.886
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000124241
Letter from ATC Associates regarding confirmatory asbestos bulk sampling conducted on the roofs of 99 Church Street.
1 shared non-person entities · 1 shared topics · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
1 shared non-person entities · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112013
Inspection form recording facade conditions and debris at the World Financial Center site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.878
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
1 shared non-person entities · similarity 0.877
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120641
Management submits environmental test results and details of common area cleaning and facade washing for multiple Rector Place buildings.
1 shared non-person entities · similarity 0.877
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150969
Contract excerpt defining regulatory compliance requirements and describing visual assessments of debris on building exteriors near the World Trade Center.
1 shared topics · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared by JLC Environmental Consultants for asbestos abatement work at 130 Cedar Street.
1 shared non-person entities · 1 shared topics · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000247640
Project monitor log for full containment abatement, including location and preparation fields.
Similarity score 0.925 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247734
Full-containment abatement monitor log with client and task labels.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247688
Full-containment abatement monitor log with location and prep status.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453278
Chain-of-custody for asbestos-related samples under Part 56 rules in NYC WTC context.
Similarity score 0.921 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000348464
Application prepared for project at 14 Wall Street related to WTC work.
Similarity score 0.921 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000247748
Full-containment abatement monitor log listing project type and phase.
Similarity score 0.921 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000125698
Cover sheet and comments regarding DEP variance approval for exterior facade cleaning at 130 Cedar Street dated January 14, 2005.
Similar indexed content
NYC-WTC_000125076
Fax transmission regarding updated asbestos project submittals and requested changes for the 130 Cedar Street permit application.
Similar indexed content
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Similar indexed content
NYC-WTC_000154680
Formal notification document for an asbestos project including submission instructions and official use fields.
Similar indexed content
NYC-WTC_000124241
Letter from ATC Associates regarding confirmatory asbestos bulk sampling conducted on the roofs of 99 Church Street.
Similar indexed content