NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 7, 2009 by TRC Environmental Corp.

NYC-WTC_000182007
Page image
Scanned page image, NYC-WTC_000182007
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/07/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from; Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:50 pm to 2:55 pm

I arrived at the premise at 1:50 pm. LVI schedule informed that activities include: remove walker ducts and raceways on 6*’’ floor, scrape fireproofing, clear off floor, temp platforms in shaft on S'^floor, demo walls, clear off floor, scrape fireproofing, erect platforms various locations on 2"“ floor, clear floor, cut ducts, demo walls, ceilings on floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 2"'^floor. Two workers were present for the decon maintenance. I used B stairwell to proceed to the 3'^ floor.

3"* Floor - 38 workers were present. Fireproofing removal at the area 5 has been completed; workers on scaffolds were cleaning the ceilings, beams, washing scaffolds, picking up debris, cleaning and sweeping the water from the floor, placing debris into the boxes, cutting edges at the shaft area to clean the floor and platforms. Others were cutting metal with tools attached to HEPA vacuum, placing into the boxes and spraying with amended water. 35 Gaylord boxes were sprayed with amended water and ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2"'’ floor.

2"'^ Floor - 58 workers were found inside the work area. Fireproofing removal was completed at the area 5. Workers were cleaning the ceilings and beams, washing equipment, scaffolds inside the shaft area, spraying with amended water, picking up debris, cleaning the floor. Other workers were cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 30 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the Y'floor.

1’‘ Floor - 72 workers were inside the work area. Platinum Electricians were inside the mechanical room working with electrical cables, two other workers were plasticizing the frame of the engine machine. Workers on scissor lifts were cutting and demolishing air ducts at the various locations, removing heating pipes; demolishing the brick wall on the east side of the work area, spraying with amended water; workers on scissor lifts were removing hard concrete drop ceiling, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 18 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the S'^ifloor.

After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhanan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned. Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131152

NYC-WTC_000182007

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182007Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →