NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 06/02/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212)962-2300
Contact Person Time of Inspection from;
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:20 pm to 3:20 pm
I arrived at the premise at 1:20 pm. LVI schedule informed that activities include: exterior fagade removal on 7'”
floor, fine clean floor on 3"* and 2"'' floors, clear floor, scrape fireproofing East & SW sides, loading out boxes to
ATC trailer on 1 floor, demo pipes & ducts, box out debris in the Basement.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on Yloor.
Two workers were present for the decon maintenance, cleaning and organizing the shower chambers and
clean room.
Negative air pressure on the floor was -0.021.
1®‘ Floor - 68 workers were present inside the work area. At the South/west side of the floor - former computer
room - and area #2 - end of the hallway near personal decon - workers on scaffolds and scissor lifts were still
scraping fireproofing, spraying the area with amended water, cleaning the floor, picking up debris, placing into
the boxes; two carpenters were setting up the platform.
At the north/east side of the work area Asbestos Handlers were harnessed in scissor lifts washing and cleaning
the ceilings, horizontal and vertical beams, walls covered with plastic; sweeping the floor using wet-dry shop
HEPA vacuum.
Other workers were replacing filters of micro trap machines, picking up water on all surfaces and debris,
sweeping the floor using equipment equipped with HEPA filters, preparing and loading out boxes through the
waste decon. A large amount of debris exists on the floor. 30 Gaylord boxes were ready for load out. 40 micro
trap machine were on and 5 on stand by. Inspection was done on micro trap tents.
Using entrance from the 1^* floor I proceeded to the basement.
Bsmt - No activities or personnel observed on the floor.
After following the decontamination procedure I signed the log book and exited the work area.
Using north hoist I proceeded to the 7'^ floor.
7*’ Floor - 15 workers were observed on the west side area of the building. At the north/west side workers
were removing the metal panels and cocking from the windows. At the south/west side workers, wearing double
suits, PPE and gloves were removing exterior aluminum cover from two vertical columns; area has been sealed
off with caution tapes. 5 sealed and sprayed Gaylord boxes were on the floor ready to be taken down.
I used north hoist to return to the ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DI I' WORBY_CANN AIA S..HP OO0131120
NYC-WTC_000181992