Asbestos inspection log, 130 Liberty Street, May 21, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on May 21, 2009, by LVI Environmental Services Inc.

NYC-WTC_000181982
Page image
Scanned page image, NYC-WTC_000181982
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 05/21/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1_______ 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze_____ F TRU2068IVIN08 no Contractor’s Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone state Zip Phone NY 10018 NY 1 (212)962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:55 pm to 2:50 pm

I arrived at the premise at 1:55 pm. LVI schedule informed that activities include: scraping Atrium area on 2"“ floor, clear floor, cut ducts, pipes, scrape fireproofing South East side, TRC/ATC visual. Eagle scaffolding - erect platforms in various shafts, loading out boxes to ATC trailer on V floor.

I proceeded to the decon on 3'‘'floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. One worker was present for the decon maintenance. Negative air pressure of the area was -0.025. I used the C stairwell to proceed to the 2"“ floor.

2'"' Floor - 16 Asbestos Handlers inside the work area were found in the process of scraping the fireproofing at the area 10 - Atrium Area, washing scaffolds and equipment, spraying the with amended water; workers on the floor picking up debris of fireproofing, using metal shovels, cleaning and sweeping the floor using equipment equipped with HEPA filters. Inside the west #2 escalator shaft two workers were cutting the metal piece and setting up two horizontal beams. Cutting air ducts inside the east shaft area and spraying with amended water. Eagle scaffolding workers were erecting scaffold and setting up platforms inside the north/east shaft. Others were preparing boxes, sweeping up the excess water from the floor near the waste decon using HEPA vacuum, spraying sealed boxes with amended water and loading them out. 15 sealed Gaylord boxes were on the floor. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used the stairs to proceed to the 1®' floor.

1^' Floor - 68 workers were present on the floor. Two workers were found on the north/west side corner of the area on ladders re-taping and plasticizing the wall. Scraping of fireproofing at the area 1 was completed and workers were washing the mezzanine, plastic, floor, equipment, preparing the area for tomorrow’s TRC and ATC visual inspection. Workers on the scissor lift were replacing old with new platform at the south side column #2. Workers at the area 4 on mezzanines and on the floor were still scraping the fireproofing, spraying with amended water, picking up debris from the floor using shovels, placing into the boxes, covering the exhaust ducts and micro trap machines with poly. Eagle scaffolding workers were erecting scaffolds at various locations of the work area. Other workers were replacing filters, cutting metal into the pieces and spraying with amended water inside the former computer room; wrapping beams with poly, preparing and loading out boxes through the north side waste decon. 40 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Rjclmiond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5-Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131098

NYC-WTC_000181982

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181982Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →