NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 05/22/09
Floor IZip Borough Block Lot Squad # Badge #
Various TiTiliT6 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 1 BTiTit3 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj, Mgr/TRC Environmental 2:05 pm to 2:50 pm
I arrived at the premise at 2:05 pm. LVI schedule informed that activities include:
Exterior fagade removal on 8*’’ floor, Stair B cleaning 6*^ floor.
I proceeded to the 6'*’ floor; 4 Gaylord boxes were on the floor outside the decon ready to be taken
to the ground floor ATC trailer. I entered the decon, signed the log book, don the appropriate level
of personal protective equipment to enter the regulated area B stairwell.
One worker was present for the decon maintenance.
Negative air pressure of the area was -0.033.
I used the stairs to proceed to the 4\ 3"^ and the 2"" floors.
4"’, 3"'’ & 2'"' Floors - 14 Asbestos Handlers were found at the B stairwell in the process of
covering holes with duct tape, wrapping pipes with plastic, taping the edges and critical barriers,
using ladders; fine cleaning and wet wiping the walls and stairs using mops, brushes, rags,
sponges, using water and Betco solution to remove the mold, cleaning and vacuuming stairs
using wet-dry shop HEPA vacuum.
Using stairs I went back to the 6*^ floor decon.
After decontamination procedure I left the decon and used A stairwell to proceed to the 8"' floor.
8"’ Floor - 5 Gaylord boxes and 5 poly wrapped beams were on the floor ready for load out.
15 workers were present on the floor working on exterior fagade removal. Workers were
removing metal panels and glass of the window on the west and south side building, spraying
pieces with water and wrapping with poly. Workers were wearing double suits, gloves and PPA.
Handler Foreman Abel Salazar informed me that workers were using personal decon
located on the 10*^ floor.
I exited the area at 2:50 pm and used south hoist to return to the ground floor.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough 1-Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131096
NYC-WTC_000181980