•jKgCTncru final SybrnitUl
I
StructanU
1 S-1 Correct the location of thc oH storage tank an< the slab opening: it should be
between columns 70,71,73 & 74. ______________ ______
2 S-2 CotTCCt tad draftm^error: Some elements are on a different levels and got ”
turned Off prior to printing.
The supports for the 11,* gal Unk does not correlate to fee section view on
the plumbing drawing. I feel that additional st«t might be required to
support the tank. , . _______ _ _ _____________ _____
3 $-3 Drawing depict water storage between column; 33,35 & 44 & 43. ‘ ~~
Coordinate with other discipline if that is necd< d (Lc. a floor drain to be
C.V
added, the door is to be relocated...)
Section 1, between columns 59,60,63 & 54, is not cross referenced propedy
to drawing S-5. Verify the size of beam.
P»gc5of 3
1
NYC-WTC_000173538
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000173538Source: NYC Law Department, mirrored locally
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
2 shared non-person entities · Same agency, volume and box · similarity 0.978
Letter from DCAS Real Estate Services to a contractor regarding proposals for work at the Mayor's Office of Emergency Management in 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.952