NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/General Design Review Comments
Document / 3 pages

HVAC compliance memo, Mayor's Office of Emergency Management, Apr 1998

Machine-extracted title · confidence 95%

Memo requesting verification that a 6000-gallon tank installation meets NYC code clearance requirements.

NYC-WTC_000167817–000167819

Folder label: “General Design Review Comments

Page image
Scanned page image, NYC-WTC_000167819
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Review of the Mayor's Office Emergency Management Final Submittal

___________________________ Structural___________________________ 1 S-I Correct the location of the oil storage tank and the slab opening: it should be between columns 70, 71, 73 & 74. 2 S-2 Correct Cad drafting error; Some elements are on a different levels and got turned off prior to printing. The supports for the 11,000 gal tank does not correlate to the section view on the plumbing drawing. I feel that additional steel might be required to support the tank. 3 S-3 Drawing depict water storage between columns 33, 35 & 44 & 43. Coordinate with other discipline if that is needed (i.e. a floor drain to be added, the door is to be relocated...) Section 1, between columns 59, 60, 63 & 54, is not cross referenced properly to drawing S-5. Verify the size of beam.

Page 3 of 3

NYC-WTC_000167819

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167819Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Plan Review Comments for 7 WTC, April 1998 · Box 7DCAS

NYC-WTC_000169716

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976

machine-extracted · confidence unavailable · Check page ↗
Punch list for Mayor's Office, March 1999 · Box 7DCAS

NYC-WTC_000173012

Detailed inspection report listing required repairs for doors, sprinklers, and electrical fixtures in the Mayor's Office.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.926

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared topics · Same agency, volume and box · similarity 0.924

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168712 · Box 7DCAS

Engineer's form requesting verification of tank placement and clearance compliance with NYC code at the facility.

Filed in the same folder

NYC-WTC_000169716 · Box 7DCAS

Technical review comments on final architectural plans for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →