05/22/1998 11:10 2018718705 BURGESS STEEL PAGE 02
Phone; (201)871-3500
(212)563-6000
EiX: (201)871-8750
BURGESS
200 WEST FOREST AVENUE • P.O. BOX 9880 • ENGLEWOOD. N-1.07631-9880
May 22, 1998
Ambassador Construction
317 Madison Avenue
New York, NY 10017
Attention: Mr, Jack Klein
Re; Mayor's Office of Emergency Management
7 World Trade Center
New York, NY
BSP Est# 98-05-4295 Rev.l
Gentlemen:
We are pleased to submit our quotation based upon the following drawings:
Architectural Drawings: D-0 thru 12, T-1, A-EG-23, Al-1, A7-1, A23-1 thru 6, A48-1 dated
5/4/98
Prepared by Swanke Hayden Connel
Structural Drawings; S-1 thru 5 dated 5/4/98
Prepared by Cantor Seinuk
SCOPE
1. Furnish and install steel post, framing and metal deck for fuel tank at .1* floor (straight time)
2. Furnish and install support steel for g inerator, water tank and switch gear at 7“’' floor (overtime)
3, Furnish and install support steel for c lolihg towers at 23'^ floor (overtime) —
4. Furnish and install 1/2" thick steel plate; to top of slab for support of water bottles at ZS”’ floor (straight —
time)
5. Furnish and install support steel for 1 siding partition at 23^ floor (overtime) -
6. Furnish and install steel sub-framing posts, flaming, bracing and metal deck for radio room at roof
(straight time) — 6 ^>’227^''
7. Furnish and install steel posts, framing and grating for fuel oil pump at 1“ floor (overtime)
8. Furnish and install approx. 50 If of seismic clip angles (overtime)
9, Furnish and install approx. 80 if of door supports at office and library on 23"' floor (overtime) .
10. Furnish and install support steel for antenna at roof (six locations) (straight time) - ’
II. Furnish and install one steel ladder and Bilco roof scuttle (straight time)
12. Furnish and install support steel for monitors (two locations) (overtime) -
13. Furnish and deliver only loose lintels
AH of the above will be flimished as outlined for the lump sum price of S264.400.00
(Two hundred sixty four thousand four hundred dollars)
EXCLUSIONS
1. Toilet partition supports.
2. Drawing D'3. Work by AV contract )r.
3. Cutting and patching of concrete and masonry.
4. Exposing and cleaning existing struct iral steel for the connection of the new steel.
5. Field paint and touch-up.