NYC-WTC_000173352
Revised construction proposal for Mayor's Office of Emergency Management work at 7 World Trade Center totaling $11,645,746.
Same agency, volume and box · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗Cover sheet for a fax transmission from Burgess Steel estimating department regarding structural steel work.
NYC-WTC_000172731–000172732Folder label: “Mayor's Office of Emergency Management '7 World Trade Center®New York, NY®BSP Est# 98-05-4295 Rev. 1”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
05/22/1998 11:10 2018718705 BURGESS STEEL PAGE 03
BURGESS Mayor's Office of Emergency Management May 22,1998 Page 2
6. Signing of New York City Departmait of Buildings Controlled Inspection fsrms (TR-1) including welding/bolting and structural stability 7, Responsibility for structural stability in any manner. 8. Shoring or falsework except for use of our trade. 9. Responsibility for tlte design and strength of connections (professional engineeiing). 10. Electric power and hook-up or disconnect fees for welding machines and power tools. 1 1. Overtime labor and delivery^_ 12. Phasing of deliveries iand erection. 13. Any protection, OSHA or otherwise. 14. Setting of loose bearing plates, anchor bolts and leveling plates. 15. Grouting/dry packing. 16. Bid, performance, payment bonds. 17. Additional insurance not covered by our standard insurance policies for our trade. 18. Special paint, (All steel to receive one coat of our standard shop primer of lead free steel red primer.) 19. Removal and demolition of existing materials. 20. Punching, burning, drilling, tapping, cutting fitting.!, or reinforcing of holes for other trades unless specifically shown and located on abo' re drawings. 21. Material not shown and located on ab< ve drawing. 22. Responsibility for any materials delive red to you which we are not required to erect.
QUALIFICATIONS 1. Any materials which jire supplied by us which are built into concrete or masonry will be delivered by us F.O.B. trucks at job site, for unloading, distribution and erection by you and at your expense. 2. We are to be given continuous use of building freight elevator or hoist for hoisting of material and equipment at no charge to Burgess Steel Products Corp. 3. Work area is to be free of interfering duct work or piping. 4. Before start of our work, all areas of spray-on fireproofing, concrete or masonry marked by us, are to be removed by others. 5. All prices will be held for sixty (60) days from this date, after which time, pHce will be subject tO all applicable labor and material increases.
TERMS OF PAYMENT Invoices are payable within 30 days of the date of the invoice. Invoices which are 31 days old are considered past doe. An 1 V4% cash discount is offered on all invoices paid with 15 days of invoice date. A service charge of 2% per month will be assessed on all past due invoices. In the event that payment is delinquent more than 60 days, the buyer agrees to pay for all costs and expenses of collection, including attorney’s fees of 15% of the amount due or to the extent permitted by law, ifthe invoice is placed in the hands of the attorney for collection.
Thank you for the opportunity to bid this pj oject.
Very truly yours, BURGESS STEEL PRODUCTS CORP. •
Monzo Estimator
NYC-WTC_000172732
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000173352
Revised construction proposal for Mayor's Office of Emergency Management work at 7 World Trade Center totaling $11,645,746.
Same agency, volume and box · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
1 shared topics · Same agency, volume and box · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173073
Revised construction proposal from Ambassador Construction for work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172600
Letter submitting a revised HVAC quotation totaling $1,564,675 for the Mayor's Office of Emergency Management at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172123
Contractor submits a revised proposal totaling $11.6 million for demolition and construction work at 7 WTC.
Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172953
Memo dated April 27, 1999 requesting funding from the construction budget for metro traffic feed and dish installation at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172316
Proposal from Ambassador Construction Company for demolition and construction work at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173147
A revised construction proposal from Ambassador Construction Co. Inc. for demolition and renovation work on the 1st, 7th, and 23rd floors of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.890
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
2 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.920 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.919 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.919 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125098
Protocol document outlining air sampling and monitoring procedures for 130 Cedar Street.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125070
Contractor requirements and site plan notes for demolition work at 30 Cedar Street.
Similarity score 0.918 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.917 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similar indexed content
NYC-WTC_000173352
Revised construction proposal for Mayor's Office of Emergency Management work at 7 World Trade Center totaling $11,645,746.
Similar indexed content
NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Similar indexed content
NYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
Similar indexed content
NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Similar indexed content