← Document results/7DCAS/Mayor's Office of Emergency Management '7 World Trade Center®New York, NY®BSP Est# 98-05-4295 Rev. 1
Document / 2 pages

Fax cover sheet from Burgess Steel, May 22 1998

Machine-extracted title · confidence 95%

Cover sheet for a fax transmission from Burgess Steel estimating department regarding structural steel work.

NYC-WTC_000172731–000172732

Folder label: “Mayor's Office of Emergency Management '7 World Trade Center®New York, NY®BSP Est# 98-05-4295 Rev. 1

Page image
Scanned page image, NYC-WTC_000172732
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

05/22/1998 11:10 2018718705 BURGESS STEEL PAGE 03

BURGESS Mayor's Office of Emergency Management May 22,1998 Page 2

6. Signing of New York City Departmait of Buildings Controlled Inspection fsrms (TR-1) including welding/bolting and structural stability 7, Responsibility for structural stability in any manner. 8. Shoring or falsework except for use of our trade. 9. Responsibility for tlte design and strength of connections (professional engineeiing). 10. Electric power and hook-up or disconnect fees for welding machines and power tools. 1 1. Overtime labor and delivery^_ 12. Phasing of deliveries iand erection. 13. Any protection, OSHA or otherwise. 14. Setting of loose bearing plates, anchor bolts and leveling plates. 15. Grouting/dry packing. 16. Bid, performance, payment bonds. 17. Additional insurance not covered by our standard insurance policies for our trade. 18. Special paint, (All steel to receive one coat of our standard shop primer of lead free steel red primer.) 19. Removal and demolition of existing materials. 20. Punching, burning, drilling, tapping, cutting fitting.!, or reinforcing of holes for other trades unless specifically shown and located on abo' re drawings. 21. Material not shown and located on ab< ve drawing. 22. Responsibility for any materials delive red to you which we are not required to erect.

QUALIFICATIONS 1. Any materials which jire supplied by us which are built into concrete or masonry will be delivered by us F.O.B. trucks at job site, for unloading, distribution and erection by you and at your expense. 2. We are to be given continuous use of building freight elevator or hoist for hoisting of material and equipment at no charge to Burgess Steel Products Corp. 3. Work area is to be free of interfering duct work or piping. 4. Before start of our work, all areas of spray-on fireproofing, concrete or masonry marked by us, are to be removed by others. 5. All prices will be held for sixty (60) days from this date, after which time, pHce will be subject tO all applicable labor and material increases.

TERMS OF PAYMENT Invoices are payable within 30 days of the date of the invoice. Invoices which are 31 days old are considered past doe. An 1 V4% cash discount is offered on all invoices paid with 15 days of invoice date. A service charge of 2% per month will be assessed on all past due invoices. In the event that payment is delinquent more than 60 days, the buyer agrees to pay for all costs and expenses of collection, including attorney’s fees of 15% of the amount due or to the extent permitted by law, ifthe invoice is placed in the hands of the attorney for collection.

Thank you for the opportunity to bid this pj oject.

Very truly yours, BURGESS STEEL PRODUCTS CORP. •

Monzo Estimator

NYC-WTC_000172732

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172732Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.894

machine-extracted · confidence unavailable · Check page ↗
HVAC revised quotation, June 1998 · Box 7DCAS

NYC-WTC_000172600

Letter submitting a revised HVAC quotation totaling $1,564,675 for the Mayor's Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.892

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →