Consultant meeting minutes #16, Nov 10 1998

Machine-extracted title · confidence 90%

Minutes of the sixteenth consultant meeting detailing construction status and fuel oil piping installation.

NYC-WTC_000172260–000172262

Folder label: “MINUTES OF CONSULTANT'S MEETING #16

Page image
Scanned page image, NYC-WTC_000172262
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO, INC.

Mayor’s Office of Emergency Management 7 World Trade Center 1, 7 & 23rd Floors Amb. Job #857-5175

>ls of November 16, 1998

CX).# Date Scope.olWork Brice Status 001 7/28 Sheetrock wall offset $7,000.00 Approved 002 7/31 Baltimore Air Coil circuit cooling $9,818.00 Void 003R 8/26 F&l plug mold outet... $3,704.00 Approved 004R 9/11 Delete concrete and reinforcing $294,338.00 Approved 005 9/4 City of NY attached letter $117,684.00 Approved 006 9/8 Additional cost for furnish door 01A $406.00 Approved 007R 9/23 Audio Visual Work and Equipment <$289,803.00> Approved 008 9/10 Change door 01B from a full lite $11,688.00 Approved 009 9/14 As per marked-up wood door $11,707.00 Approved 010 9/15 F&l (1) special class package $2,666.00 Approved oil 10/1 Change door 05 from hollow metal $2,898.00 Approved 012 10/5 As per FSK-E5 to provide volmeter $7,766.00 Approved 013 10/5 As per FSK-E5-25 additional framing $985.00 Approved 014 10/7 As per attached letter from Cosentini <$5,216.00> Approved 015 10/8 As per SHC sketch for new sleeve $21,234.00 Approved 016 10/15 On Drwg El-23 dated 9/25/98 $37,862.00 Pending 017R 10/22 P&l add’l floor boxes under raised $5,042.00 Approved 018 10/19 The Sharp XG-E3000 U $16,761.00 Void 019 10/21 Replace 42"x30" decoustic panels $4,636.00 Approved 020 10/21 In response to the RFI #33 $11,000.00 Approved 021 10/22 As per Cantor Seinuk sketches $18,500.00 Approved 022R 10/30 F&l (2) 6 strand multi-mode fiber $6,726.00 Pending 023 11/3 As per sketch from Cantor $7,534.00 Pending 024 11/3 Below items are to control all (60) $3,001.00 Pending 025 11/13 Structural support for microwave.. $36,199.00 Pending 026 11/13 as per SHC sketch FSK-37, 38 12.. $12,599.00 Pending 027 11/13 Paint Ian room in lieu of VCT <$481.00> Pending 028 11/16 As per RFI #36 in order to feed ELP $1,478.00 Pending 029 11/16 As per FSK-E10 dated 11/13/98 $464.00 Pending

c:\wpdocs\oem[oemoos.wpd]

317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762

NYC-WTC_000172262

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172262Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Consultant meeting minutes #18 for OEM, Nov 1998 · Box 7DCAS

NYC-WTC_000173557

Minutes from Ambassador Construction Co. regarding project status and fuel oil piping routes at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →