* OCJ 15 ’99 15!04 FR AMBASSADOR C0N3TR. COS'12 949 9762 TO 5693640 P.02X03
AMBASSADOR CONSTRUCTION CO. INC
0
Mr, Walter Weems
Silverstein Properties, Inc.
October 15,1998
7 World Trade Center
New York, NY 10048
RE: Mayor's Office of Emergency Management
7 World Trade Center -1, 7 & 23rd Floors
Change Order #018
Amb,.Job #86716175
Dear Mr. Weems:
We are pleased to submit herewith our change order #C16 to perform the following work at the
above referenced premises for the sum of THIRTY SEVEN THOUSAND EIGHT HUNDRED
SIXTY TWO DOLLARS ($37,862.00):
SCOPE OF WORK / \
As per electrical plans dated 9/3/98 and 9/25/98 representing 0/ision changes #3 and 4:
1) On drawing El -23 dated 9/26/98, relocate panel C7
ELP’-23N3 in the Ian room. Panel and conduit?.
previously Installed. ,' t, >
Electrical Cost $3,300.00
/
2) On drawing E3-01 dated 9/3/98, tap the secondary
of the 75KVA transformer and feed a new 200amp
7 switch with shunt trip. This is to redirect the feed
to ATS #7 on the roof.'
Electrical Cost $4,310.00
/
3) Provide servioe oonneciion to 208 volt single phase
Q dishwasher per drawing El-23 dated S/25/98.
Electrical Cost $1,740.00
4) Add on/fl) fire alarm pull station.
Electrical Cost $ 950.00
6) Upgrade wiring to dimming panel from new breaker
^panel EDPL-23E fed by a TOamp breaker.
Electrical Cost $1,825.00
6) Additional switching roon>2330, included new and
relocated wiring.
Electrical Cost $ 640.00
Forward...