Change Order #088 for fuel oil piping, 7 World Trade

Machine-extracted title · confidence 95%

Contractor submission of change order #088 to install new fuel oil piping and relocate ductwork at 7 World Trade Center.

NYC-WTC_000171303–000171307

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #088 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000171303
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Ambassador construction co., inc. i

June 10, 1999

Mr' Walter Weems Silverstein Properties Inc. 7 wWorid Trade Center New York, NY 10048

Re: Mayor's Office of Emergency Management ' 7 World Trade Center I Change Order #088 I Amb. Job#Sl>7-5175

I

D^ar Mr. Weems:

Wfe are pleased to submit herewith our change order #088 to perform the following work at thi above referenced premises for the sum of ONE HUNDRED TWENTY THOUSAND NINE HUNDRED FIFTY SEVEN DOLLARS ($120,957,00):

I W^ have carefully Surveyed the new fuel oil piping route as per the following:

I • ! The eight inch conduit which will carry the 1 1/4" supply, return and overflow pipe, will i run through the second floor machine room corridor into the building communications room and above the lobby ceiling to the fuel oil tank room.

• j In order for this work to be done, building ductwork must be removed and re-routed. j Also other electrical piping will have to be relocated. The double door for the communications room will be removed and replaced by a single door.

• I The ceiling lobby sheetrock ceiling will be removed and replaced after the piping is ‘ installed. I • j The lobby area in front of the handicap elevators will have scaffolding so the different I trades can work while we keep the elevators operational.

• j All work is to be performed on normal working hours, except for the scaffolding work, j There is no overtime included in the other costs. I I ( ! I Continued...

317 ^^ADISON AVENUE . NEW YORK, NY 10017.212 922 1020 - FAX 212 949 9782 1 NYC-WTC_000171303

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171303Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #88 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168409

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

2 shared non-person entities · Same agency, volume and box · similarity 0.945

machine-extracted · confidence unavailable · Check page ↗
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.918

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168409 · Box 7DCAS

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

Filed in the same folder

Compare copies and versions →