Mr. Glenn Pymento
Department of Qty Wide Administrative Services
Divis on of Real Estate Services
1 Centre Street, DRES - Room 2000 North
New York, New York 10007
RE: 7 World Trade Center
Mayor's Office of Emergen^
Management-1'*, 7*, & 23™ Rrs
Chaogej r#88
Dear Mr. Pymento:
Attacfied please find change order #88 in the amount of $120,957.00 submitted by
Ambassador Construction for the following scope of work;
The eight inch conduit which will carry the IV*" supply, return and overflow
pipe, will run through the second floor machine room corridor into the building
I communications room and above the lobby ceiling to the fuel oiil tank room.
in order for this work to be done, building ductwork must be removed and re
routed. Also other electrical piping will have to be relocated. The double door
! for the communications room will be removed and replaced by a single door.
The ceiling lobby sheetrock ceiling will be removed and replaced after the piping
is installed.
The lobby area in front of the handicap elevators will have scaffolding so the
different trades can work while we keep the elevators operational.
All work is to be performed on normal working hours, except for the scaffolding
work. There is no overtime included In the other costs.
Demolition $2,500.00
Drywall/Carpentry $1,500.00
Hollow Metal/Hardware $850.00
Ceilings $4,600.00
Electiic $6,500.00
HVAC $54,000.00 ✓