NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management - 1st, 7th, & 23rd Flrs Change Order #88
Document / 2 pages

Submission of Change Order #88 for 7 World Trade Center,

Machine-extracted title · confidence 95%

Letter submitting change order costs for fuel line work at the Mayor's Office of Emergency Management.

NYC-WTC_000171739–000171740

Folder label: “7 World Trade Center Mayor's Office of Emergency Management - 1st, 7th, & 23rd Flrs Change Order #88

Page image
Scanned page image, NYC-WTC_000171740
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

. 20-d -WlOi z

Mr. Glenn Pymento June 17,1999 Page Two... !

Painting $3,500.00 1 Masonry $6,000.00 Scaffold $21,845.00 $800.00 I Steel Shop Drawing from original C/0 I Subtotal $104,096.00 General Conditions $8,328.00 Overhead and Fee $6,745.00 Insurance $1.788.00 Total $120,957.00

If required by the Port Authority, the 2-hour rated fireproofing around this piping will cost $100.00 per linear foot. Please add $15,000.00 to the above co:^. 2-hour fating consists of vermiculite plaster with lath. The original change order #44 for fuel oil line for $85,000.00 will be deleted, an|d this change order will supercede that change order.

If this meets with your approval, please sign and return to my office. iI Thank you. Sincerely,

Walter!. Weems III Building Manager cc: Cathy Giliberti Chi Chu Bill Oacunto Richard Ramos (DCAS) I I

Josep Domingvez (DCAS) I 1 ■ I j i

20-d S2:TT 666T-r2-Nnr i NYC-WTC_000171740

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171740Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #88 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168409

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.942

machine-extracted · confidence unavailable · Check page ↗
Change Order #85 cover letter, May 1999 · Box 7DCAS

NYC-WTC_000172336

Cover letter submitting Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines at 7 World Trade Center.

4 shared non-person entities · Same agency, volume and box · similarity 0.933

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168409 · Box 7DCAS

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →