Change Order #16R electrical work, 7 WTC, Nov 1998

Machine-extracted title · confidence 95%

Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.

NYC-WTC_000168642–000168644

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #016R Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000168642
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document NOJ 23 '98 15.00 FR AnOASSflDOR CONSTR. C0212 949 9762 TO 7325190 P.01/03

AMBASSADOR CONSTRUCTION CO., INC

■^\

.71 \

November 13,1998 6»/ Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York. NY 10048

RE; Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #016R Amb, Job#S57-5175

Dear Mr. Weems;

We are pleased to submit herewith our change order #016R to perform the following work at the above referenced premises for the sum of TWENTY ONE THOUSAND FIVE HUNDRED NINETEEN DOLLARS ($21,519.00);

SCOPE OF WORK As per electrical plans dated 9/3/98 and 9/25/98 representing revision changes #3 and 4;

1) On drawing El-23 dated 9/25/98. relocate panel ELP-23N3 in the Ian room Panel and conduits previously installed. Electrical Cost $3,300.00

2) On drawing E3-01 dated 9/3/98, tap the secondary of the 75KVA transformer and feed a new 200amp switch with shunt trip. This is to redirect the feed to ATS #7 on the roof. Electrical Cost $4,810.00

3) Provide service connection to 208 volt single phase dishwasher per drawing El-23 dated 9/25/98. Electrical Cost $1,740.00

4) Add one (1) fire alarm pull station. Electrical Cost $ 950.00

5) Upgrade wiring to dimming pane! from new breaker in panel EDPL-23E fed by a 70amp breaker. Electrical Cost $1,825 00

Forward.. . 317 MADISON AVENUe. NEW YORK, NY 10017. 212 922 1020. FAX 212 949 9762

NYC-WTC_000168642

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168642Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #024R submission, Nov 1998 · Box 7DCAS

NYC-WTC_000171914

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.966

machine-extracted · confidence unavailable · Check page ↗
Change Order #85 submission, 7 WTC, May 1999 · Box 7DCAS

NYC-WTC_000168422

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173884 · Box 7DCAS

Ambassador Construction submits Change Order #016R for $21,519 to relocate a panel and tap a transformer at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171897 · Box 7DCAS

Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.

Similar indexed content

NYC-WTC_000168647 · Box 7DCAS

Change Order #16 submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated October 15, 1998.

Similar indexed content

NYC-WTC_000171903 · Box 7DCAS

Ambassador Construction submits Change Order #018 for electrical work at the Mayor's Office of Emergency Management on October 15, 1998.

Similar indexed content

NYC-WTC_000171914 · Box 7DCAS

Ambassador Construction submits revised Change Order #024R for switch installation at the Mayor's Office of Emergency Management on November 5, 1998.