Change Order #88 submission, 7 WTC, June 1999

Machine-extracted title · confidence 95%

Contractor submits Change Order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at the Mayor's Office of Emergency Management.

NYC-WTC_000168409–000168410

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #088 Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168409
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO., INC.

Mr. Walter Weems June 10, 1999 D Silverstein Properties Inc. 7 World Trade Center New York, NY 10048

Re; Mayor’s Office of Emergency Management 7 World Trade Center Change Order #088 Amb. Job #557-5175

Dear Mr. Weems;

We are pleased to submit herewith our change order #088 to perform the following work at the above referenced premises for the sum of ONE HUNDRED TWENTY THOUSAND NINE HUNDRED FIFTY SEVEN DOLLARS ($120,957.00);

We have carefully surveyed the new fuel oil piping route as per the following;

• The eight inch conduit which will carry the 1 1/4" supply, return and overflow pipe, will run through the second floor machine room corridor into the building communications room and above the lobby ceiling to the fuel oil tank room.

• In order for this work to be done, building ductwork must be removed and re-routed. Also other electrical piping will have to be relocated. The double door for the communications room will be removed and replaced by a single door.

• The ceiling lobby sheetrock ceiling will be removed and replaced after the piping is installed.

• The lobby area in front of the handicap elevators will have scaffolding so the different trades can work while we keep the elevators operational.

• All work is to be performed on normal working hours, except for the scaffolding work. There is no overtime included in the other costs.

Continued. . .

317 MADISON AVENUE • NEW YORK, NY 10017 • 212 922 1020 • FAX 212 949 9762

NYC-WTC_000168409

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168409Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #85 submission, 7 WTC, May 1999 · Box 7DCAS

NYC-WTC_000168422

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171303 · Box 7DCAS

Contractor submission of change order #088 to install new fuel oil piping and relocate ductwork at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000172231 · Box 7DCAS

Submission of Change Order #85 for $34,401 for additional work related to fuel-oil line routing at 7 World Trade Center.

Similar indexed content

NYC-WTC_000172338 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #85 for fuel oil piping work at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000168422 · Box 7DCAS

Contractor submits Change Order #85 for $34,401 to install new piping for re-routed fuel oil lines, including masonry work.