Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166877
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

BASIC ELECTRICAL*MATERIAKS. METHODS AND REQUIREMENTS

PART 1 - GENERAL

1.01 DESCRIPTION

A. Comply with General Conditions and Division One.

B. Basic Electrical Materials, Methods and Requirements applies to all sections of Division 16.

C. Codes, Permits and Inspections:

1. All work shall meet or exceed the latest requirements of New York City Building Code, New York City Electrical Code, P.A. Standards and all national, state, county, municipal, and other authorities exercising jurisdiction over electrical construction work and the project.

2. All required permits and inspection certificates shall be obtained, paid for, and made available at the completion of the work. In the event that no official authority exists which will issue a certificate attesting to the safety of the electrical installations, such a certificate shall be acquired from an independent agency selected by the Architect. Inspection and certification fees levied by this agency shall be paid for as part of the electric work.

3. Any portion of the work which is not subject to the requirements of an electric code published by a specific authority having jurisdiction shall be governed by the National Electrical Code and other applicable sections of the National Fire Code, as published by the National Fire Protection Association.

4. Equipment, material, layout and installation provided as part of the electrical work shall conform to the requirements of all agencies having jurisdiction. Include as part of the electrical work all required filings and submissions for approval. Equipment furnished separate from - but installed as part of - the electrical work, which does not have all necessary approvals, shall not be installed until approvals are obtained by the parties furnishing the equipment.

OEM PPS-2 Generators 7 WTC March 20, 1998

NYC-WTC_000166877

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166877Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →