3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗DEP letter re tunnel project drawings, July 1987
Machine-extracted title · confidence 95%Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
NYC-WTC_000165377–000165383Folder label: “North Access Tunnel W. 33rd St. To w. 38TH ST”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document -2- Z y
« i 7. Clarify whether a proposed 15” E.S.V.P. sewer shown as connecting catch basins is a sewer or a catch basin connection. Be advised no more than two catch basins can be connected in series and that catch basin connection should be 12" D.I. Class 56 pipe with push-on joints on stone ballasL See NYC Standard.
8. Show the existing sewer to be picked up at manhole No. 1 and the existing sewer openings to be plugged at manhole No.2.
9. Show on the plan and profile the existing and proposed structures.
SO. There is no record of a 12” storm sewer to be removed on drawing No. C-I2, C.MP on drawing No. C-12, 12” to be removed or abandoned on drawing No. C-13, t 12" on drawing No. C-13A. / 11. Submit structural computations signed and sealed by a N.Y.S.P.E. for flow distri bution chamber, twin maintenance chamber A an B, flow adopter chamber. No. bend of sewer is allowed between flow adopter chamber and manhole No. 2. Show type of manholes. Submit borings for the area. Show type of catch basins . Show type of proposed sewer.
12. Show the deflection angles, radius etc. for all the chambers.
13. Indicate that all sewers shown as to be abandoned have no house connections. 14. Submit drawing No. C-21 as part of contract drawings. IS. There is no need to show standard details of catch basin type 2, cast iron grating, cast iron manhole frame and cover, cast iron steps, manhole frame and cover, and vitrified clay pipe on cone, cradle on earth or rock as shown on drawing Nos. C-19 and C-20. The hydraulic computations as submitted by you are being reviewed by our Private Drain age Review Section. Their comments will be related to you when received from that office. Please submit three (3) complete sets of contract drawings revised in accordance to these comments for our review. Drawing Nos. S-28, S-29, S-29A, S-30 and S-30A should be made part of the set.
Very truly yours,
DOUGLAS SMITH, P.E., ACTING CHIEF Engineering Review Section, Bureau of Sewer ♦
NYC-WTC_000165383
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165395
Department letter providing feedback on sewer relocation design drawings and elevation datum requirements.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165358
Inter-office memorandum requesting engineering review of final plans for the North Access Tunnel from W. 33rd to W. 38th Street.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165556
Mailroom dispatch document regarding the World Trade Center Church Street Underpass project.
1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165831
Department of Environmental Protection review comments on submitted sewer plans requiring stationing, invert elevations, and manhole labeling.
1 shared topics · Same agency, volume and box · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165395
Department letter providing feedback on sewer relocation design drawings and elevation datum requirements.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165389
Correspondence addressing departmental comments on the 60 percent design submission for the tunnel project.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165289
Environmental Protection Department record related to tunnel project between W. 33rd and W. 38th Street.
Filed in the same folder
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Filed in the same folder
NYC-WTC_000165299
DEP legal correspondence regarding tunnel construction and sewer work in vicinity of 11th Avenue and W. 33rd Street.
Filed in the same folder
NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
Filed in the same folder
Filed in the same folder