NYC 9/11 Public Portal Document
18 2001 21:07 . P.06
New York Cify Afayor ‘s Office ofEmergency Managemenl
Acee.TS Policy; Puilding Owncf S'A/aHager^, Contractors, Pesidcnfs - October Iff 2001
Access Policy: Building OwnersZManagers, Contractors^
and Residents as of October J 8, 2001
Procedure for Building Owners/Managers:
• Building owners/managers, with personal photo identification along with proof of
ownership of building (e.g. deed, ground. lease) or right to occupy .same, or other
proof of authority to .act on the owner’s behalf, must meet with the contractor(s) at the
NYPD access vat; located at Broadway and Fulton Streets.
• Building owners/managers and contractor's) will be intejv’iewed by an NhTD official
in charge at which time they will present all required ID and building credentials.
o Owner or managing agent will be required to sign a police release form issued by
KVPD whereby owner assumes liability for the building, its contents, and occupants.
• Upon NYPD’s satisfaction of proof of OvA'nership/management authority, and all
required photo ID’s, NYPD may, in its sole discretion make arrangements with the
owner and contractorfs) to provide access at the established checkpoint.
Procedure for Contractors:
• Contractors will be granted access provided the owner or supeiintendent of the
building accompanies them to where work is to be done. In addition, contractors
mu.5t show photo ID and provide a list of all workers and social security numbers that
will be working on site.
• All workers must have photo ID and ID establishing its employment by the contractor
(including SS#). Upon NYPD satisfaction of identification, the contractor and owner
or superintendent will be escorted to tire site.
• The contractor is responsible for assembling the entire work crew at the established
checkpoint at the appointed time.
• NYPD may allow vehicle access for work crews and equipment on West Street on a
case-by-case basis.
• Thi.s Work Crew access Procedure will be repeated each day access is required.
• Contractors and their work crews are to remain at the specified work location.
Any deviations will result in removal from the area and any further requests for
access w ill be denied.
Procedure for Contractorjs) Work Crews. Vehicles & Equipment:
• The contractor is responsible for assembling all vehicles requiring access for the
workday at South and Pike Streets.
• Contractor’s crew chief will then go to the access van at Broadw'ay and Fulton Streets
and notify rhe NYPD inspector in charge that all vehicles are ready and waiting at
South Street.
• flic crew chief wall then nde with NYTD to South and Pike Streets where all vehicles
will be inspected and all personnel ID will be checked.
Page 3 of2
NYC-WTC_000154482
OCR can misread numbers and units. Confirm readings against the page image before using them.