NYC 9/11 Public Portal Document
> /few rorkCiiyMt^r’s Office ofEmerg&uyMatu^emeni
Access Policy; BulUing Contraetors, ResiitcKls-October iS, 2001
Access Policy: Building Owners/Managers, Contractors,
and Residents os af October 25,2002
Procedure for Building Qwners/Managers:
• Building owners/managers, with personal photo idoitification along with proof of
ownership of building (e.g. deed, ground lease) or right to occupy same, or other
proof of authority to act on the owner’s behalf, must meet with the contractor(s) at (he
NYPD access van located at Broadway and Fulton Streets.
> Building owners/managers and contractor's) will be interviewed by an NYPD official
in charge at whidi time they will present all required ID and building credentials.
• Owner or managing agoit will be required to sign a police release form issued by
NYPD wherdjy ownrar assumes liability for file building, its contents, and occupants,
• Upon NYPD’s satisfection of proof of ownrarship/managranrait authority, and all
required photo ID’s, NYPD may, in its sole discretion make arrangements with the
owner and contractorfs) to provide access at the established checkpoint.
Procedure for Contractors;
• Contractors will be granted access provided the owner or superintendent of the
building accompanies them to where work is to be done. In addition, contractors
must show photo ID and provide a list of all workers and social security numbers that
will be working on she.
• All woikers must have photo ID and ID establishing its employment by the contractor
(including SS^. Upon NYPD satisfaction of identification, the contractorand owner
or superintendent will be escorted to the site,
• The contractor is responsible for assembling fire entire work crew at the established
checkpoint at the appointed time.
• NYPD may allow vehicle access for work crews and equipment on West Street on a
case-by-case basis.
• This Work Crew access Procedure will be repeated each day access is required.
• Contractors and their work crews are to remain at the specified work location.
Any deviations will result in removal from the area and any further requests for
access will be denied.
Procedure for Contractor's) Work Crews. Vehicles & Equipment:
* The contractor is responsible for assembling all vehicles requiring access for the
• workday at South and Pike Streets.
• Contractor’s crew chief will then go to the access van at Broadway and Fulton Streets
and notify die NYPD inspector in charge (hat all vehicles are ready and waiting at
. South Street
• The crew duef will (hen ride with NYPD to South and Pike Streets where all vehicles
will be inspected and all personnel ID will be checked.