NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
New Yprk Construction News Page 2 of2 Continuing, Henshaw said OSHA has taken over 2,2000 environmental samples since Sept. 13 and found that exposure levels are well below recognized levels. However, •respirators are used because things change daily."
Patricia Clark, OSHA's regional administrator, said that the ever-changing environment at the WTC site •ts the biggest hazard on the site. She described the changing environment as a changing rubble pile with fires burning below it, movement of the rubble pile and void spaces below it. As a result, this ever-changing environment creates unique hazards that have and will continue to be addressed."
AMEC Vice Chairman John cavanagh estimated on Nov. 20 that approximately six months more of debris removal work remains and that half of It has already been removed.
He noted that ~e fires continue. It Is the longest commercial fire that has ever occurred at a site. A volume of plastic, carpet and furniture below the rubble is what is continuing to bum. The New York Fire Department Is there constantly wetting down crttlcal areas. And with all that has gone on, It has been an extremely safe site."
"The unprecedented challenges and hazards at the WTC site call for unprecedented cooperation between labor, management and government," noted BCTC President Edward J. Malloy.
"This partnership," Malloy added, •1s needed to protect the safety and health of dedicated and courageous workers who are laboring under such difficult circumstances."
He added that shared Information through the agreement "will allow us to address long- term Issues:
The signed accord calls for the following:
• Prevention of occupational related fatalities and serious injuries and illnesses for all workers Involved In the WTC Emergency Project. • Compliance with and implementation of the WTC Emergency Project • Environmental, Safety and Health Plan. • Immediate abatement of all serious hazards. • The sharing of all exposure monitoring data to include sampling for air contaminants, noise, heat and cold, radiation and biological agents. • The sharing of all safety hazards.
"This unprecedented partnership between government, labor and management Is helping to make the most dangerous construction site In America into the safest one," said BTEA Chairman Louis J. Coletti.
Ground Zero contractors who participated In the signing of the agreement Included Bovis Lend Lease LMB, Turner Construction, Tully Construction, AMEC Construction Management Inc. and Plaza Construction.
The following parties have also agreed to continue to work In cooperation with organizations assisting in the WTC Emergency Project to achieve the goals of this partnership: the New York City Office of Emergency Management, the New York Police Department, the New York City Department of Health, the New York State Department of Environmental Conservation, the New York State Department of Labor, the Port Authority of NY&NJ, Liberty Mutual Insurance Co., the U.S. Environmental Protection Agency and the Building and Construction Trades Department of the AFL-CIO.
Click here for more WTC Articles »
41 print this page I ~ e-mail this page I subscribe
http://newyork.construction.com/news/WTC/0111 _groundZero.asp 07/18/2003
NYC-WTC_000146734
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000105599
Laboratory report detailing asbestos analysis results for samples from 61 Broadway collected in September 2001.
Cited alongside this record in an Ask answer