DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
• World Trade Center Emergency Project Environmental, Safety, and Health Plan Revision 0 15 October 2001
2.5.2 Outside of Rubble Piles
Some of the bulk dust samples taken from various locations within the WTC Complex have been found to be positive for asbestos. All settled dust located outside the perimeter of rubble piles shall be treated as asbestos containing material (ACM) until bulk sampling indicates that dust being cleaned is not asbestos containing(< 1% asbestos). Cleanup operations involving asbestos containing dust shall be conducted by workers using proper protective equipment and work practices (e.g., wet methods, dry sweeping prohibition, use of HEPA vacuums). Any site workers assigned to dust/asbestos cleanup work shall be trained in asbestos hazards and proper clean up procedures.
Prime Contractors/subcontractors shall comply with Federal OSHA asbestos standard 29 CFR 1926.1101 and applicable city and state training and licensing requirements.
2.6 LEAD
Steel and other building substrates have the potential to either contain lead, or be covered with •lead containing protective coatings. Workers performing operations such as, but not limited to, welding, torch cutting; torch burning, etc., may potentially be exposed to lead in excess of the Federal OSHA PEL of 0.05 mg/m3 as an 8 hour TWA. Prime Contractors/subcontractors performing such operations shall comply with 29 CFR 1926.62. Until a negative exposure assessment is made, at a minimum, Prime Contractors/subcontractors shall provide the following:
• Designate area on, above, within, or under rubble piles as controlled areas • Engineering and work practice controls • Written lead compliance program • Respiratory protection (including a written respiratory protection program) • . Protective work clothing and equipment • Proper housekeeping practices • Hygiene facilities and practices • Medical surveillance per the requirements of 29 CFR 1926.62 • Employee training • Waste handling procedures
In the event a negative exposure assessment is made through the exposure monitoring program discussed in Section 2.4, the DDC ES&H Director shall be notified within 24 hours of such an assessment. Whenever there is a change of equipment, process, control, personnel, or a new task has been initiated that may result in employees being exposed to lead above the action level or PEL, the employer shall conduct additiomd monitoring as required by 29 CFR 1926.62.
42
NYC-WTC_000146529
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000145510
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
Cited alongside this record in an Ask answer
NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000105599
Laboratory report detailing asbestos analysis results for samples from 61 Broadway collected in September 2001.
Cited alongside this record in an Ask answer