NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146528
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

World Trade Center Emergency Project Environmental, Safety, and Health Plan I Revision 0 15 October 2001

2.5 ASBESTOS

Asbestos fibers have been found in some bulk and air samples taken within and outside of the rubble piles at the WTC site. This is not unexpected given that many structures built prior to 1979 had asbestos containing materials (ACM) used in building construction (e.g., pipe/equipment insulatio~ fireproofing, floor/ceiling tiles, electrical components, coatings). Thus, the potential exists for workers to be exposed to asbestos while removing debris from the rubble piles and in conducting demolition activities in structural damaged buildings adjacent to the piles. To help reduce the potential for asbestos exposure to personnel working within the WTC site and to minimize the spread of dust (which may contain asbestos fibers) during demolition and debris removal, loading, and transport to disposal sites, the Project bas implemented a Dust Protection and Suppression Plan (see Appendix. B).

Ongoing demolition activities in structurally damaged buildings are covered under an Emergency Declaration issued for the Project, which includes an. exemption from the normal requirements involving the investigation and abatement of ACM. If, in the future, contractors working on the WTC site become involved in renovation work in damaged buildings adjacent to • the site, it is their responsibility to contact the NYCDEP's Bureau of Environmental Compliance regarding applicable rules and regulations for asbestos abatement activities.

2.5.1 On, Above, Within, or Under Rubble Piles

Until a negative exposure assessment is made, Prime Contractors/subcontractors shall assume workers located on, above, within, or under rubble piles are exposed to asbestos in excess of the Federal OSHA permissible exposure limit (PEL} of 0.1 fibers per cubic centimeter as an eight hour time weighted average (iWA), and/or Excursion Limit of 1 fiber per cc for 30 minute sample. Where a negative exposure assessment has not been made or where exposure to asbestos. is greater than the PEL or Excursion Limit, the following shall be included, as a minimum, in the Prime Contractor's/subcontractor's ES&H program:

• Designate area on, above, within, or under rubble piles as controlled areas • Engineering and work practice controls designed to control asbestos exposure • Personal air monitoring • Respiratory protection (including written respiratory protection program) • Hygiene facilities and practices • Training • Housekeeping • Medical surveillance

In the event a negative exposure assessment is made through the exposure monitoring program discussed in Section 2.4, the DDC ES&H Director shall be notified within 24 hours of such a determination. After a negative exposure assessment bas been made, whenever there is a change of equipment, process, control, personnel or a new task has been initiated that may result in an increased exposure to asbestos, the employer shall conduct additional monitoring to reevaluate asbestos exposure.

41

NYC-WTC_000146528

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146528Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →