NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 44/No folder label
Document / 60 pages

WTC emergency safety plan draft, Sept 2001

Machine-extracted title · confidence 100%

Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.

NYC-WTC_000164671–000164730
Page image
Scanned page image, NYC-WTC_000164697
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

World Trade Center Emergency Project Environmental, Safety, and Health Plan Draft - Revision A 30 September 2001

contaminants (dust, metals, volatile organic compounds, and other specific compounds) heat stress, cold stress and noise.

Federal, EPA, NIOSH, and New York City DDC may determine minimum site monitoring requirements. Contractors are expected to conduct exposure monitoring for all employees as required by OSHA or local requirements. All exposure data must be provided to the DDC ES&H Department.

2.4.1 Required Site Monitoring

Site monitoring is required under the following conditions. • When required by specific OSHA standards (e.g., asbestos, benzene, , lead, formaldehyde, Carbon Monoxide) • When worker exposure is reasonably anticipated to be greater than 50% of the OSHA Permissible Exposure Limit (PELs), ACGIH TLV, or other recognized occupational exposure limit • When necessary to verify the adequacy of hazard control measures and/or personal protective equipment, including respiratory protection • When necessary to assess and evaluate worker exposure, or to resolve worker complaints or concerns

With the approval of the DDC/Site ES&H Director, site monitoring may be discontinued after representative initial monitoring is conducted and worker exposures are shown to be adequately controlled through the use of engineering, work practice, or personal protective equipment control measures. If work activities change so that the initial monitoring is no longer representative of worker exposure, monitoring must be reinitiated.

2.4.2 Monitoring Strategy

The construction/demolition contractor is expected to submit to the DDC/Site ES&H Director an employee-monitoring plan that reflects the anticipated task specific hazards. Where monitoring is required, the DDC IH contractor shall develop and implement a monitoring program that considers the factors that may affect worker exposure and the following elements:

• Monitoring requirements, contaminants, and monitoring equipment limitations • Contractor-specific work locations, work activities, work practices, personnel, and equipment to be used on site • Any additional site-specific hazard information gathered by the contractor during development of the task-specific JHA.

The monitoring strategy shall be documented in the task-specific JHA and include the type of monitoring (direct reading, personal, perimeter or area monitoring), activities or locations to be monitored, contaminants, monitoring instrumentation, monitoring methods, and frequency of monitoring as appropriate.

27

NYC-WTC_000164697

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000164697Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →