NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document lU/Ol/Ol MUN io:oa FAX 212 695 5984 Bechtel URS Greiner JV 141004
Schedule will include both twenty-four (24) hour a day monitoring, seven (7) days per week until directed to change by the site ES&H Director. Notice of additional changes to schedule will be made at least one week prior to anticipated change. Contractor is responsible for maintenance of sample and monitoring database for all data collected during the project. The Contractor is expected to provide sample analysis results to the overall WTC database in a format compatible with the selected format at no additional cost.
Site ES&H Director reserves the right to reject data not meeting Data Quality Objectives at no cost to the project. Site ES&H Director reserves the right to audit the Contractor facility and procedures. Deficiencies between stated qualifications and audit results will be corrected at no cost to the project. Contractor may substitute equivalent methods or procedures with approval of site ES&H Director.
Required Site Monitoring Site monitoring is required under the following conditions. • When required by the Subcontract, or task-specific HASP • When required by specific OSHA standards (e.g., asbestos, benzene,, lead,, carbon monoxide) • When worker exposure is reasonably anticipated to be greater than 50% of the OSHA Permissible Exposure Limit (PELs), ACGIH TLV, or other recognized occupational exposure limit • When necessary to verify the adequacy of hazard control measures and/or personal protective equipment, including respiratory protection • When necessary to assess and evaluate worker exposure, or to resolve worker complaints or concerns. With the approval of the site ES&H Director, site monitoring may be discontinued, after representative initial monitoring is conducted and worker exposures are shown to be adequately controlled through the use of engineering, work practice, or personal protective equipment control measures. If work activities change so that the initial monitoring is no longer representative of worker exposure, monitoring must be reinitiated.
Monitoring Strategy The Contractor is expected to submit to the site ES&H Director an employee-Monitoring Plan that will provide the required information to identify and control workplace hazards. . Where monitoring is required, the Contractor shall develop and implement a monitoring program that considers the factors that may affect worker exposure and the following elements. • Monitoring requirements, contaminants, and monitoring equipment limitations • Subcontractor-specific work locations, work activities, work practices, personnel, and equipment to be used on site • Any additional site-specific hazard information gathered by the Subcontractor during development of the task-specific HASP
2
CITY_21MC100_007083334
NYC-WTC_000188123
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
8 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
9 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
13 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120940
Document tracking environmental samples collected from Building #100 at 345 South End Avenue on October 22, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120991
Record documenting the transfer and custody of air samples from Building #100 at 345 South End Avenue collected on October 22, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121462
Record documenting the transfer and custody of air samples from Building #500 at 385 South End Avenue collected on October 22, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121409
Document tracking environmental samples collected from Building #500 at 385 South End Avenue on October 22, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
11 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161939
Page from a laboratory report containing only formatting characters and no readable content.
5 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119908
Record documenting the transfer and custody of air samples from 365 South End Avenue collected on October 17, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119863
Document tracking environmental samples collected from 365 South End Avenue on October 17, 2001.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161325
Final scope of work documents for indoor dust cleaning and monitoring contractor activities in WTC cleanup program.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139560
Updated WTC monitoring scope of work including technical notes on dust control methods and equipment.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140385
Specific instructions for collecting bulk dust samples, labeling containers, and repairing insulation disturbed during sampling activities.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000176016
Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
Similar indexed content
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
Similar indexed content
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar indexed content
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
Similar indexed content
Document tracking environmental samples collected from Building #100 at 345 South End Avenue on October 22, 2001.
Similar indexed content