NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 8 pages

Draft Statement of Work for indoor dust sampling, 2002

Machine-extracted title · confidence 90%

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

NYC-WTC_000176016–000176023
Page image
Scanned page image, NYC-WTC_000176019
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TASK 6: Monitorina Site Reconnaissance;

Measure and record any obstructions and the distances and heights of any objects, including collocated samplers, that extend at least as high as the sample inlet and are within 1 m of the sample inlet; record descriptions of the obstructions.

Note any occurrences or circumstances that may or could effect air or wipe samples (e.g., construction, renovation, nearness to gas combustion(cooking)).

Deliverables

The Contractor shall make site observation notes in the comments section provided on the COC form and in the daily field sampling log.

Reporting and Communication Requirements The following reports shall be prepared by the contractor and distributed to the designated recipients in accordance with each specified requirement. Times are specified in the calendar periods. Reports submitted under this contract shall cite the contract number in addition to identifying the Environmental Protection Agency (EPA) as the sponsoring agency.

Technical Reports

Documents/reports required iMh^erformar^ of Mgtract agtivitiM shal^esubmitted by the contractor to the Project Officer (i.e. Pi Status Reports. .etc)

Health and Safety Plans X The contractor shall prepare a project specific Health and Safety Program Plan that complies with State and Federal Requirements. A copy of the Health and Safety Plan shall be submitted to the Project Officer within ten (10) days following contract award.

Health and Safety Plans shall be prepared in accordance with Federal Register, “Safety and Health Program” 40 CFR 1910.120(b), and with Washington State General Occupational Health Standards, WAC 296-62-3010, Safety and Health Program.

£ Communication

Upon approval of the Task Order Statement of Work, the Contractor shall maintain at least weekly communication with the PO regarding the status of the work on this Task Assignment.

Inherently Gc■Hduliil-hi'i Functlpne

The contractor shall not perform any inherently government functions (IGF) under this Task Assignment. If during the course of developing the plan of work, through receipt of technical direction, or in carrying out the assignment, any portion of the effort is considered to possibly be an IGF, the Contractor must immediately notify the Project Officer and the Contracting Officer.

Occupational Health and Safety

Facility site visits conducted under this Task Assignment which involves on-site inspections or sampling must be conducted in full compliance with the Department of Labor Occupational Safety and Health

NYC-WTC_000176019

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000176019Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000178163

Contractual document outlining services to collect and analyze dust samples for hazardous substances in selected New York City buildings.

Similar indexed content

Compare copies and versions →