Measure and record any obstructions and the distances and heights of any objects, including
collocated samplers, that extend at least as high as the sample inlet and are within 1 m of the
sample inlet: record descriptions of the obstructions.
Note any occurrences or circumstances that may or could effect air or wipe samples (e.g.,
construction, renovation, nearness to gas combustion(cooking)).
Deliverables
The Contractor shall make site observation notes in the comments section provided on the COC form and in
the daily field sampling log.
Reporting and Communication Requirements
The following reports shall be prepared by the contractor and distributed to the designated recipients in
accordance with each specified requirement. Times are specified in the calendar periods. Reports
submitted under this contract shall cite the contract number in addition to identifying the Environmental
Protection Agency (EPA) as the sponsoring agency.
Technical Reports
Documents/reports required in the performance of contract activities shall be submitted by the contractor to
the Project Officer (i.e. Productivity Reports, QA/QC Reports, Weekly Project Status Reports..etc)
Health and Safety Plans
The contractor shall prepare a project specific Health and Safety Program Plan that complies with State
and Federal Requirements. A copy of the Health and Safety Plan shall be submitted to the Project Officer
within ten (10) days following contract award.
Health and Safety Plans shall be prepared in accordance with Federal Register, “Safety and Health
Program” 40 CFR 1910.120(b), and with Washington State General Occupational Health Standards, WAC
296-62-3010, Safety and Health Program.
Contractor Communication
Upon approval of the Task Order Statement of Work, the Contractor shall maintain at least weekly
communication with the PO regarding the status of the work on this Task Assignment.
Inherently Government Functions
The contractor shall not perform any inherently government functions (IGF) under this Task Assignment. If
during the course of developing the plan of work, through receipt of technical direction, or in carrying out the
assignment, any portion of the effort is considered to possibly be an IGF, the Contractor must immediately
notify the Project Officer and the Contracting Officer.
Occupational Health and Safety
Facility site visits conducted under this Task Assignment which involves on-site inspections or sampling
must be conducted in full compliance with the Department of Labor Occupational Safety and Health
Administration rules under 29 CFR Part 1910 and EPA Order 1440 (Occupational Health and Safety
Manual).