NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146389
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document SR s ‘ASBESTOS INSPECTION REPORT (continued) 26. Asbestos Hauler ATC NYS DEC Permit # 14-371 Disposal Site(s)S- Alleghinies landfill, RD3 P.O. Box 310, Hollsopple, PA 27. This asbestos abatement is part of a (item a through e requires filing of this form with NYC Department of Buildings) a) £1 Demoiition b) 1 Boiler Replacement c) C1 Sprinkier Replacement 4) LJ Renovation/Alteration e) C1 Fireproofing Replacement M1 Other (Describe) Emergency Asbestos clean up 28. TYPE OF ABATEMENT (Check all appropriate boxes) C1 Removal C1 Enclosure C Encapsulation (C1) Repair @] clean up "faerie! 29. ABATEMENT PROCEDURE (Cheok all appropriate boxes) (1 Fut Containment [1] Giovebag [1 tent ©] DEP Variance Application 30. LOCATIONS OF ABATEMENT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(s) OF FLOOR CONTAINING ACM PERFORMED (@.g. entire, east wing, room #, (0.9. Pipe lagging, ceiling, plenum | SQUARE LINEAR (e.g. running cable, installing fire sprinklers, __bolier room, lobby, etc) ducts, storage tanks, decking, et.) _| FEET = removing and replacing bollers, etc.) 10th Hallway & APTA,B,C | all affected surfaces 4,500 |. 0|}ACM clean up only 31. | hereby declare that the information provided herein Is true and complete to the best of my knowledge. | am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work. Central Environmental Inc. Black Rock Construction Co. Tony Brown Print Name of Air Monitor Print Name of Asbestos Contractor Print Name of (if other than Owner} Vi#Z Signature 7 Signéture Signature 12/10/01 12/10/01 12/10/01 Data Date Date 32. | understand that as the owner of a building where asbestos abatement activity occurs, | am responsible for the performance of the asbestos abatement activities in accordance with the Contro! Program Rules. | have contracted the third party air monitor who is completely independent of all parties the asbestos project. | hereby declare that | have authorized the filing of this notification for the work specified herein. : : 65 Nassau Owners Corp. 12/10/01 Signature Date Print Name of Owner A STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE. (“Any modification of Information provided on this form must be reported immediately In writing directly to the NYC DEP AGP. ] The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened through the performance of work in incremental! or piecemeal fashion. ACP7 2/2001 NYC-WTC_000146389

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146389Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →