NYC-WTC_000126053
An asbestos project notification and inspection report form for 150 Duane Street requiring signatures.
22 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Project notification form for asbestos abatement activities submitted to the NYC Department of Environmental Protection.
NYC-WTC_000109630–000109642Folder label: “115 West Broadway”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ASBESTOS INSPECTION REPORT (continued) 26. Asbestos Hauler ATC NYS DEC Permit # 1A•- 3 71 Tel.# J 6 31) 9 2 4 — 5 0 5 n
Disposal Sites) Southern Alleghenies Di posal Road 3 Box 31 fl Val 1 e Svc'a iew Hollsopple PA 15935 27. This asbestos abatement is part of a (Item a through a requires filing of this form with NYC Department of buildings) a) ❑ Demolition b) ❑ Bober Replacement c) ❑ Sprinkler Replacement d) ❑ Renovatio iAtteration Asbestos Containing Dust e) ❑Fireproofing Replacement t)o Other (Describe)
28. TYPE OF ABATEMENT (Check all appropriate boxes) ❑ Removal ❑ Enclosure ❑ Encapsulation ❑ Repair Clean up
29. ABATEMENT PROCEDURE (Check all appropriate boxes) Ig Fun Containment ❑ Glovebag ❑ Tent ❑ DEP Variance Application i ij` j7 $ 0' %n I APAri# IIQ nC £QATCUCIIT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING Floor(s) OF FLOOR CONTAINING ACM PERFORMED (ap. S *L eat wkq, mom R. (..a Piv Upping clam. piersan (e.g. Ard*Q oobts. inshttrw tbs sgtUJ rs. boxeoom rr duds, e FE ar
Roof Entire Sue ring f R of 3,0 0 Cleaning of ACM
Federal. 31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with State and NYC laws and reoulations applicable to asbestos related work.
J.C. BrodeZ•ick & 1 2 Banc1 Interior 192 Branch Interior Associat s rnt Nsms er ttaet Owned Print Nims or Air Mont Prim estoe Contractor ams d _______
2n cJ /L1 gnature Signature Signature
/oi rriz4of Date Date Dc
32. I understand that as the owner of a building where asbestos abatement activity occurs. I am responsible for the performance of the asbestos abatement activities in accordance with the Asbestos Control Program Rules. I have contracted the third party air authorized the monitor who is completely independent of all parties involved in the asbestos project. I hereby declare that I have filing of this notification for the work specified herein. Zu/M(S (Ai 5(3 Signature LL/21L2±__ Date Print Nameof Owner
A STAMPEDCOPYOFTHISFORMINCLUDING AMENDMENTSMUSTBEAVAILABLEATTHEWORKSITE. Any modification of information provided on this form must be reported immediately in writing directly to the NYCDEP ACP.• The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened through the performance of work in incremental or piecemeal fashion. r1 2KI00
NYC-WTC 000109635
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000126053
An asbestos project notification and inspection report form for 150 Duane Street requiring signatures.
22 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
8 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100522
Cover page for an asbestos project notification form submitted to the New York City Department of Environmental Protection.
9 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗9 shared non-person entities · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126772
NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
8 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126757
NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
8 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118062
Official DEP form documenting the results of an asbestos inspection at 49 Broadway with a total measurement of 15,510 square feet.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127238
Invoice from Fiber Control Inc. dated July 18, 2002, detailing charges for facade cleaning services at 143 Chambers Street.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119534
Invoice from Kurzban & Son Control Inc. for roof asbestos removal work completed at 49 Ann Street.
8 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000109628
Record of asbestos inspection activities conducted at the World Trade Center site by the Department of Environmental Protection.
Filed in the same folder
NYC-WTC_000126053
An asbestos project notification and inspection report form for 150 Duane Street requiring signatures.
Similar indexed content
Similar indexed content
NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
Similar indexed content
Similar indexed content