ASBESTOS INSPECTION REPORT (continued) ' '
LO O O~ ~Z72-3
26. Asbestos Hauler NYS DEC Permit —O~ 2
Disposal Sites) OU I e2N t/~ l)P-IJ ~e 5 Telj~ i(
27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings)
a) ❑ Demolition b) ❑ Boiler Replacement c) ❑ Sprinkler Replacement d) ❑ Renovation/Alteration
e) 0 Fireproofing Replacement f) ❑ Other (Describe) _ _
28. TYPE OF ABATEMENT (Check all appropriate boxes)
❑ Removal 0 Enclosure 0 Encapsulation 0 Repair 0 Clean up
29. ABATEMENT PROCEDURE (Check all appropriate boxes)
❑ Full Containment ❑ Glovebag 0 Tent 0 DEP Variance Application n O O y
/
30. LOCATIONS OF ABATEMENT /
DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM DESCRIPTION OF WORK BEING
Floor(s) OF FLOOR CONTAINING ACM PERFORMED
(e.g. entire. east wing, room U. (e.g. Pipe lagging, ceiling, plenum SQUARE LINEAR (e.g running cable, installing fire sprinklers.
boiler room, lobby, etc) ducts, storage tanks. deding. etc.) FEET FEET removing and replacing toilers, etc.)
31. I hereby declare that the information provided herein is true and complete to the best of my knowledge. I am familiar with Federal,
State and NYC laws and regulations applicable to asbestos related work.
Sclt
Pnnt N rr
cE~ttitn{t~
itor
lJ C~7J
Pnn Name I s stns Contractor
OT~ ,)7 7/ c r'
Print Nam of App ant (If other than Owner)
r
Signature nature Signature
Date Date Date
32. I understand that as the owner of a building wh re asbestos abatement activity occurs, I am responsible for the performance of
the asbestos abatement activities in accordan with the Asbestos Control Program Rules. I have contracted the third party air
monitor who is completely independent of all p6rties involved in the asbestos project. I hereby declare that I have authorized the
filing of this n ificatio or the work sPecifieytereirL ~~ n~
Print Name of Owner Signature Date
,,,,/.STAMPED COPY OF THIS FORM INCLUDING AMENDMENTS MUST BE AVAILABLE AT THE WORK SITE.
I_AnymodificationofinformationprovidedonthisformmustbereportedimmediatelyinwritingdirectlytotheNYCDEPACPI1
.
The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened
through the performance of work in incremental or piecemeal fashion. WO