NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146390
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document GITY DOPNAT! DEP NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Asbestos Control Program 59-17 Junction Boulevard, gª Floor, Corona, NY 11368-5107 ASBESTOS PROJECT NOTIFICATION (ASBESTOS INSPECTION REPORT) 1aw2046нNO2 FOR OFFICNL UEE ONN TYPEWRITTEN EMIERGENC FORMS WINL BE ww.nyc.govidep 1. (See fee schedule) When submitting this form at the NYC Department of Buildings, the original form and three (3) copies with original signatures are required. Submittal at the NYCDEP requires one copy of the form with original signatures. This form must be submitted to the NYC DEP not less than one week in advance of the start of abatement activities. I. FACILITY 2. Address 90 Church Street AKA 90 Church Street Station 5. Type of Facility Postal Facility Borough Manhattan _ 3. Block 86 _ 6. Name of Building 90 Church Street Station _ Zp_10007 _4. Lot 1 Il. BUILDING OWNER 7. Name U.S. Postal Service, C/o 90 Church Street, L.P. 8. Contact Person John Coppola 9. Tel. Fax # 10. Address 90 Church Street City New York State NY _ Zip 10007 III. GENERAL CONTRACTOR 11. Name Structuretone Tel. IV. ASBESTOS ABATEMENT CONTRACTOR 12. Name PAL Environmental Safety Corp. 14. Federal Employer ID. 15. Tel. _13. Contact Person Michael Chain Fa .. 16. Address 43-09 Vernon Boulevard City Long Island City State NY Zip_11101 V. THIRD PARTY AIR MONITOR 17. Name Ambient Group 19. Federal Employer ID 20. Tel 18. Contact Person John Leitner Fax 21. Address 55 West 39th Street Ctty_New York 22. Sample Analysis Laboratory Ambient State NY 23. NYS DOH ELAP # 11732 _Zip_10018 VI. PROJECT INFORMATION 24. Starting date for this portion ofwork_12/20/02 Projected completion date 12/1/03 Asbestos work schedule M Monday ETuesday Wednesday ThursdayEFridayDsaturday -Sunday •am pm 18 Shift from: 7:00 _ Eam •pm to 3:30 If other, specify 4:00 pm to 12:30 am Access toinspect the premises must be provided during the work schedule indicated in this item. RECEIVED DEG 20 2002 HEDAA 25. Total amount of asbestos-containing material to be abated during this work 47,200 Square Feet, and/or 0 Linear Feet ACP 7 2/2001 NYC-WTC_000146390

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146390Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →