NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document * _ NYC DEPARTMENT OF ENVIRONMENTAL PROTECTIO a 59-17 Junction Boulevard, 8 Fibor, Corona, NY 11368-5107, < ROJEGT NOTIFICATIO INSPECTION REPORT) 4, $1200 (See fee schedule) J When iting thi Gf Buildings, the original form and three (3 les with original \\ Sranebes eS gio bled requires one copy of the form with wild Gomes form mi submitted to the NYC DEP not less one week in advance of the start of abatement activities . I, FACILITY , * Ctl —— ax wee a 2. Address 167 Eldridge Street : Borough Manhattan zip 10002 AKA____* : 3. Block 420 4. Lot _68 5. Type of Facility Garage/Warehouse 6. Name of Building Il. BUILDING OWNER 7. Name Schoolyard Eneterprises, LLC. 8. Contact Person Hypp Kourakos 10. Address 271 Main Street City Eastchester State NY Zip 10709 Ill. GENERAL CONTRACTOR 11. Name, Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 12, Name Safeway Environmental Corp. 13. Contact Person MitchAlvo 14.Federa Employer 0, JD :;. 1 i — -.. _ 16. Address _1379 Commerce Avenue __ City Bronx State NY Zip 10461 V. THIRD PARTY AIR MONITOR 17. Name GCI Environmental _ 18. Contact Person Jim Grond 19. Federal Employer , ti“‘(‘CSZSR 2 1 ~— £m 21. Address 655 3rd Avenue ~ City New York State NY Zip 10017 22. Sample Analysis Laboratory Scientific Labs 23. NYS DOH ELAP # 11480 VI. PROJECT INFORMATION 24. Starting date for this portion of work 12/17/01 Projected completion date 12/19/01 Asbestos work schedule Monday Tuesday Wednesday w Thursday Friday C1 saturda Mw am oO pm to 4 O am wi pm Shift from: 7 If other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. DEC 12 2001 TEP/BANHM 5 - SRES AL 25. Total amount of asbestos-containing material to be abated during this work . PROGRAM NYC-WTC_000146385
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
11 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000119416
Form recording facade and ACM status for 125 Barclay Street following WTC collapse.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000109630
Project notification form for asbestos abatement activities submitted to the NYC Department of Environmental Protection.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102542
NYC DEP asbestos project notification form for inspection and abatement activities at 114 Liberty Street.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000116064
Application form submitted to DEP notifying of an asbestos inspection and abatement project at 102 North End Avenue.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128041
Application for roof work at 143 Fulton Street submitted by Benjamin Kurzban & Son Control Inc.
Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127588
Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000153382
Document arguing that respirator safety issues fall under OSHA jurisdiction and should be removed from the EPA review.
Cited alongside this record in an Ask answer
NYC-WTC_000138846
OSHA transmits NYS DOL data report containing sample summaries and worker information for WTC.
Cited alongside this record in an Ask answer