NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 08/EPA OIG LAW
Document / 620 pages

NYC Law Department letter regarding EPA draft report excerpts, July

Machine-extracted title · confidence 100%

Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.

NYC-WTC_000146129–000146748

Folder label: “EPA OIG LAW

Page image
Scanned page image, NYC-WTC_000146386
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document ASBESTOS INSPECTION REPORT (continued) 26. Asbestos Hauler Asbestos Transportation Corp. .NYS DEC Permit # 1A-371 Tel. Disposal Site(s), Meadowfll Landfil, Bridgeport, WV 27. This asbestos abatement is part of a (ltem a through e requires fling of this form with NYC Department of Buildings) b) • Boiler Replacement c) Sprinkler Replacement 6) Dfireprofing Roplacement 1) El Other (Describe) Removal & disposal of contaminated del rRanovation/Aneration 28. TYPE OF ABATEMENT (Check all appropriate boxes) • Removal • Enclosure • Encapsulation •Repair E Clean up 1463 MNGl 29. ABATEMENT PROCEDURE (Check all appropriate boxes) • Full Containment L Glovebag •Tent • DEP Variance Application (SEE ATTACHED LETTER) 30. LOCATIONS OF ABATEMENT DESCRIBE SECTION Floor(s) OF FLOOR (e.g. entire, east wing, room #, boiler room, lobby, etc) Siab Entire AFFECTED SURFACES CONTAINING ACM •g. Pipe lagging, ceiling, plenun ucts, storage tanks, decking, etc Demolition Debris TAMOUNT OF ACM DESCRIPTION OF WORK BEING PERFORMED SQUARE LINEAR FEET FEET (e.g. running cable, installing fire sprinklen 1,800 removing and replacing boilers, etc. o Debris removal & cleanup 31. Ihereby declare that the information provided herein is true and complete to the best of my knowiedge. 1 am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work GCI Environmental Safeway EnuonfeRN Cop Safeway Environmental Corp Print Name of Air Monitor pone Srnd Print N me of Asbestos Contractor icant (If other thap Owmer 1, иферр иурр 12-11-0 1/11/01 Date 1рі/i 32. I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible for the performance of e asbestos pro that I have authorized the filing of this notification for the work speciued herein. School Yard Enterprises, LLC 1 RualE 12/11/01 Print Name of Owner Signature A STAMPED COPY OF THIS FORM INCLUDING XMENDMENTS MUST BE AVAILABLE AT THE WORK SITE. de ported immed The reduiranhentis of the Asbestos Control Program Rules may not be lawhily avolided or lessened *o the NYC DEP ACP. through the performance of work in incremental or piecemeal fashion. ACP7 2/2001 Bniwna, sintiteuarl NYC-WTC_000146386

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000146386Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →