NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
NYC-WTC_000146129–000146748Folder label: “EPA OIG LAW”

OCR status: ocr · source: ours
NYC 9/11 Public Portal Document : 3 «7 48 a a amg NYé DEPARTMENT OF ENVIRONMENTAL PROTECTION a a Gp. Asbestos Control Program 4 id Mus ( re f afte = 59-17 Junction Boulevard, 8" Floor, Corona, NY 11368-5107 ‘ oh. _* LDS erie ITTEN ‘%,. #” \ ASBESTOS PROJECT NOTIFICATION FORMS Wi (ASBESTOS INSPECTION REPORT) pwow.nyt.govidep } 4. $1200 (See fee schedule) When subm at the: YC Department of Buildings, the original form and three (3) copies [™ oy ted. Submittal at the NYCDEP requires one copy of the form with original signaturgs, \’ d Tust be submitted to the 2 NYGEDEP not less than one week in advance of the start of abatement % I. FACILITY tfc! %} 2. Address 110 Church Street Borough Manhattan Zip 10007 AKA 3. Block 126 4.Lot 2 5. Type of Facility Vacant Commercial Bldg. 6. Name of Building il. BUILDING OWNER 7. Name Lions Head 110 Development LLC c/o Worldwide Holdings Incs. Contact Person Michael Riegler 9. Tel. # Fax a, 10. Address 150 East 58th Street City New York State NY Zip 10155 ill. GENERAL CONTRACTOR 11. Name. Tel. # IV. ASBESTOS ABATEMENT CONTRACTOR 42. Name Pinnacle Environmental Corp 13. Contact Person Robert Ryan 14, Federal Employer ID. | Cd 15.1 ne os SC 16. Address 64-54 Maurice Avenue City Maspeth State NY Zip 11378 V. THIRD PARTY AIR MONITOR 17. Name Environmental Monitoring & Consulting Assoc 18. Contact Person _George Russell 19. Federal Employer i 20. i. = Fax zh 21. Address PO Box 872 City Sommerville State NJ Zip _08876 22. Sample Analysis Laboratory EM&CA 23. NYS DOH ELAP # 11058-01 _ VI. PROJECT INFORMATION 24. Starting date for this portion of work _ 11/27/01 Projected completion date , 1/31/02 Asbestos work schedule Monday Tuesday Wednesday Thursday Friday O Saturday C Sunday Shift from: 7.00 Mam Cpm to 5.30 Flam Mpm If other, specify Access to inspect the premises must be provided during the work schedule indicated in this item. 25. Total amount of asbestos-containing material to be abated during this work 622,702 Square Feet, and/or 0 Linear Feet NYC-WTC_000146374
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
254 shared non-person entities · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
21 shared non-person entities · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
19 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132519
A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
29 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
12 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099112
Invoice from Fiber Control, Inc. dated November 27, 2002, for exterior cleanup services at multiple sites including 113 Nassau Street.
8 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130799
Invoice from Benjamin Kurzban & Son Control, Inc. for roof work completed at 15 Dutch Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113167
Invoice from Fiber Control Inc. for cleaning services on the facade of 54 Warren Street.
13 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099818
Billing record for asphalt and gravel roof cleanup services performed at 55 Nassau Street in November 2002.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000119790
Invoice from Fiber Control Inc. for DEP environmental protection services at 14 Barclay Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122774
An invoice from Fiber Control Inc. dated August 2002 for facade services performed at 179 Broadway.
11 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121922
Invoice dated October 2002 for environmental remediation services performed on the exterior of 118 Chambers Street.
9 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000115929
Form header for an Asbestos Project Notification regarding inspection at a location.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111453
NYC DEP Asbestos Project Notification form for an inspection report submission.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127588
Cover sheet or identification page for records associated with 94 Fulton Street from the DEP archive.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098653
Invoice from Asbestos Removal Corp detailing costs for asphalt and gravel roof cleanup.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100549
Itemized invoice from Asbestos Removal Corp. detailing costs for asphalt and gravel roof cleanup at 110 Liberty Street.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108259
Invoice from Fiber Control Inc. for cleaning additional facade and asphalt roof surfaces at a World Trade Center site in January 2003.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000153382
Document arguing that respirator safety issues fall under OSHA jurisdiction and should be removed from the EPA review.
Cited alongside this record in an Ask answer
NYC-WTC_000138846
OSHA transmits NYS DOL data report containing sample summaries and worker information for WTC.
Cited alongside this record in an Ask answer