NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Air Handling Unit
1. Ensure that the air handling unit motor is locked out and is electrically isolated, and place the air handling unit and its components under containment prior to beginning work. A temporary Zip-wall containment of 6-mil, fire retardant polyethylene sheeting extending from the floor to the ceiling deck, and maintained under negative pressure using a HEPA- filtered air filtration device is sufficient. The footprint of the containment should be large enough to accommodate a ladder or scaffolding. Note that WRS Infrastructure and Environment, Inc. may construct the containment prior to the start of ventilation system cleaning. In addition, WRS Infrastructure and Environment, Inc. shall install a service opening to facilitate cleaning of interior components. The access panel shall be installed in the supply air duct between the blower and the reheat coil. 2. Clean the filter racks at the return air side of the unit by damp wiping. 3. Prior to cleaning, place polyethylene sheeting underneath the coils. Wet clean the upstream and downstream sides of cooling coils. Apply manufacturer-approved cleaning solution to the coils using low pressure methods (i.e., airless sprayer, hand operated pump). 4. Clean the blower assembly and blower housing in place. The blower assembly and blower housing shall be cleaned by a combination of hand vacuuming, damp wiping and air washing. As required in this document, air washing shall only be performed after a vacuum collection device has been installed. 5. HEPA vacuum remaining interior surfaces and components (e g., condenser equipment and compartment, controls, outside air vent to condenser compartment) to remove ail visible debris. No encapsulant materials may be used inside the condenser compartment. 6. Perform a final cleaning by wet-wiping and/or HEPA vacuuming methods of the interior work area containment surfaces, ladders, equipment etc. prior to final visual inspection and wipe sampling.
Reheat Coils
1. Clean the electric reheat coil (located inside the supply air duct) by dry vacuuming or air washing. No liquids may come into contact with the electric reheat coil.
Supply Air Ducts and Terminal Difiusers
1. Remove all terminal diffusers into 6-mil polyethylene bags and proceed to the enclosure constructed for cleaning of the air handling unit. Terminal diffusers shall be wet-cleaned. The diffusers should be sprayed with Simple Green or a similar environmentally safe degreaser and hand washed as needed to remove adhered materials. 2. Seal the diffuser openings using 6-mil polyethylene sheeting to be secured with duct tape. 3. Install a vacuum collection device at the terminal end of the duct section to be cleaned. If the entire duct is not cleaned as one unit, then isolate the section of the duct to be cleaned using a zoning device. 4. The supply air duct shall be cleaned using a pressurized air/mechanical brush system in combination with a vacuum collection device. The direction of cleaning shall be from the air handler toward the terminal end of the duct. (It is permissible to use a mechanical brush followed by application of pressurized air in lieu of combination style equipment.) The 13
NYC-WTC_000145217
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer