NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Standard Operating Procedure Page 4 of 15 Fall Protection
It is measured as the distance between the location of an employee's body belt or body harness attachment point at the moment of activation (at the onset of fall arrest forces) of the deceleration device during a fall, and the location of that attachment point after the employee comes to a full stop.
Equivalent - means alternative designs, materials, or methods to protect against a hazard which the employer can demonstrate will provide an equal or greater degree of safety for employees than the methods, materials or designs specified in the standard.
Failwe - means load refusal, breakage, or separation of component parts. Load refusal is the point where the ultimate strength is exceeded.
Freefall - means the act of falling before a personal fall arrest system begins to apply force to arrest the fall.
Freefall distance - means the vertical displacement of the fall arrest attachment point on the employee's body belt or body harness between onset of the fall and just before the system begins to apply force to arrest the fall. This distance excludes deceleration distance, and lifeline/lanyard elongation, but includes any deceleration device slide distance or self-retracting lifeline/lanyard extension before they operate and fall arrest forces occur.
Guarti-ail system - means a barrier erected to prevent employees from failing to lower levels.
Hole - means a gap or void 2 inches (5.1 cm) or more in its least dimension, in a floor, roof, or other walking/working surface.
Infeasible - means that it is impossible to perform the construction work using a conventional fall protection system (i.e., guardrail system, safety net system, or personal fall arrest system) or that it is technologically impossible to use any one of these systems to provide fall protection.
Lanyard - means a flexible line of rope, wire rope, or strap which generally has a connector at each end for cormecting the body belt or body harness to a deceleration device, lifeline, or anchorage.
Leading edge - means the edge of a floor, roof, or formwork for a floor or other walking/working surface (such as the deck) which changes location as additional floor, roof, decking, or formwork sections are placed, formed, or constructed. A leading edge is considered to be an "unprotected side and edge" dirring periods when it is not actively and continuously under construction.
Lifeline - means a component consisting of a flexible line for connection to an anchorage at one end to hang vertically (vertical lifeline), or for connection to anchorages at both ends to stretch horizontally (horizontal lifeline), and which serves as a means for connecting other components of a personal fall arrest system to the anchorage.
Low-slope roof- a roof having a slope less than or equal to 4 in 12 (vertical to horizontal).
Lower levels - means those areas or surfaces to which an employee can fall. Such areas or surfaces include, but are not limited to, ground levels, floors, platforms, ramps, runways, excavations, pits, tanks, material, water, equipment, structures, or portions thereof.
Mechanical equipment - means all motor or human propelled wheeled equipment used for roofing work, except wheelbarrows and mopcarts.
Opening - means a gap or void 30 inches (76 cm) or more high and 18 inches (48 cm) or more wide, in a wall or partition, through which employees can fell to a lower level.
Overhand bricklaying and related work - means the process of laying bricks and masonry units such that the surface of the wall to be jointed is on the opposite side of the wall from the mason, requiring the mason to lean over the wall to complete the work. Related work includes mason tending and electrical installation incorporated into the brick wall during the overhand bricklaying process.
NYC-WTC_000145141
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer