130 Cedar Street July 15, 2004
Selective Demolition and Façade Restoration Koenen Associates
covering on newly installed work where reasonably required to ensure freedom from
damage or deterioration at time of substantial completion; otherwise, clean and perform
maintenance on newly Installed work as frequently as necessary through remainder of
construction period. Adjust and lubricate operable components to ensure operability
without damaging effects.
F. To extent possible through reasonable control and protection methods, supervise
performance of work In a manner and by means which will ensure that none of the work
whether completed or in progress, will be subjected to harmful, dangerous, damaging, or
otherwise deleterious exposures during construction period. Such exposures include
(where applicable, but not by way of limitation) static loading, dynamic loading, internal
pressures, external pressures, high or low temperatures, thermal shock, high low
humidity, air contamination or pollution, water, Ice, solvents, chemicals, light, radiation,
puncture, abrasion, heavy traffic, soiling, bacteria, insect infestation, combustion,
electrical current, high speed operation, Improper lubrication, unusual wear, misuse,
incompatible interface, destructive testing, misalignment, excessive weathering,
unprotected storage, improper shippingthandling, theft and vandalism.
G. Require Installer of each major unit of work to inspect substrate to receive the work, and
conditions under which the work will be performed, and to report (in writing to Contractor)
unsatisfactory conditions. Do not proceed with the work until unsatisfactory conditions
have been corrected In a manner acceptable to Installer.
H. Where Installations Include manufactured products, comply with Manufacturer's
applicable Instructions and recommendations for installation to whatever extent these
are more explicit or more stringent than applicable requirements indicated in the Contract
Documents.
I. Inspect each item of materials or equipment immediately prior to installation and reject
damaged and defective items.
J. Provide attachment and connection devices and methods for securing work properly as it
is Installed; true to line and level, and within recognized industry tolerance if not otherwise
indicated. Allow for expansions and building movements. Provide uniform joint widths in
exposed work, organized for best possible visual effect. Refer questionable visual-effect
choices to Architect for final decision.
K. Recheck measurements and dimensions of the work as an integral step of starting each
installation.
L. Install work during conditions of temperature, humidity, exposure, forecasted weather,
and status of project completion which will ensure best possible results for each unit of
work in coordination with entire work. Isolate each unit of work from non-compatible
work, as required to prevent deterioration.
M. Coordinate enclosures.(closing-in) of work with required inspections and tests, so as to
avoid necessity of uncovering work for that purpose.
N. . Mounting Heights: Except as otherwise Indicated, mount individual units of work at
industry-recognized standard mounting heights, for application indicated. In CMU walls
mount units at height closest to Manufacturer's recommendation so as to minimize
cutting of block coursings. Refer questionable mounting height choices to Architect for
final decision.
END OF SECTION
I
Materials and Equipment 1600-4
NYC-WTC 000125144
OCR can misread numbers and units. Confirm readings against the page image before using them.