(C) Removal of Mounted Objects. After critical barriers and isolation barriers are in place, mounted objects shall be removed and HEPA-vacuumed or wet wiped or both. Localized HEPA-filtered vacuum equipment shall be used during mounted object removal to reduce potential asbestos dispersal.
(d) Elevator Shutdown or Isolation. Elevators running through the regulated abatement work area shall be shut down except as noted in this Subdivision:
(1) Isolation Detail. In projects where the elevator cannot be shut down, the hoistway door frames shall be enclosed with nominal 2” x 4” framing, 16 inch on center, covered with 3/8-inch thickness plywood or OSB sheathing, and caulked or duct taped airtight at all seams. The enclosures shall be covered with two (2) seamless layers of at least six (6) mil plastic sheeting duct taped and sealed airtight. A final larger layer of at least six (6) mil plastic sheeting shall be duct taped and sealed airtight, but with slack, forming a larger perimeter diaphragm to sense air movement caused by elevator operation. (2) Elevator Shaft Ports. Elevator shaft ports for pressure equalization when within the regulated abatement work area, shall be vented to the outside or non-work areas using oversized solid-walled ducts or chambers constructed with 3/8-inch thickness plywood or OSB sheathing over nominal 2” x 4” framing, 16 inch on center. The joints shall be caulked and the ducts or chambers shall be sealed with two (2) layers of at least six (6) mil fire-retardant plastic sheeting and duct tape. The first layer of plastic sheeting shall be attached to the ducts or chambers using spray adhesive. This system shall be subjected to and pass a negative pressure test daily. (e) Floor, Wall & Ceiling Plasticizing and Sealing. All floor, wall and ceiling surfaces, except where abatement of ACM, PACM or asbestos material shall be performed on those specific surfaces, shall be covered with two (2) layers of, at a minimum, six (6) mil fire-retardant plastic sheeting. The floor shall be plasticized first, and its plastic sheeting shall extend up the walls a distance of at least twelve (12) inches on all sides. The walls shall then be plasticized by applying plastic sheeting from the ceiling to the floor, overlapping the floor sheeting by at least twelve (12) inches. Next, the ceiling shall be plasticized overlapping the walls by at least twelve (12) inches, to form a secure airtight seam. This process shall be repeated for the second layer of plastic sheeting for the floor, walls and ceiling. All seams within a layer shall be separated by a distance of at least six (6) feet and sealed airtight with duct tape. All seams between layers shall be staggered at least two (2) feet. (f) Barrier/Plasticizing Exemptions. (1) Negative Pressure Tent Regulated Abatement Work Area Enclosure. An alternate isolation method may be used where preparation of the entire room/space is either unfeasible or not necessary to adequately access all impacted ACM, PACM or asbestos material.
12 NYCRR56 Subpart?, Page 67
CITY_21MC100_003235087
NYC-WTC_000233353
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
11 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
15 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
6 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097177
Permit application requesting licensed asbestos contractors to clean debris and dust from the interior of 125 Cedar Street.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140443
Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000124241
Letter from ATC Associates regarding confirmatory asbestos bulk sampling conducted on the roofs of 99 Church Street.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
Similar indexed content
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similar indexed content
NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
Similar indexed content
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similar indexed content
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Similar indexed content