NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
NYC-WTC_000145027–000145344Folder label: “NO INFO”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Standard Operating Procedure Pages of 15 Fall Protection
Personalfall arrest system - means a system used to arrest an employee in a fall from a working level. It consists of an anchorage, connectors, a body belt or body harness and may include a lanyard, deceleration device, lifeline, or suitable combinations of these. As of January 1, 1998, the use of a body belt for fall arrest is prohibited.
Positioning device system - means a body belt or body harness system rigged to allow an employee to be supported on an elevated vertical surface, such as a wall, and work with both hands free while leaning.
Rope grab - means a deceleration device which travels on a lifeline and automatically, by friction, engages the lifeline and locks so as to arrest the fall of an employee. A rope grab usually employs the principle of inertial locking, cam/level locking, or both.
Roof- means the exterior surface on the top of a building. This does not include floors or formwork which, because a building has not been completed, temporarily become the top surface of a building. "Roofing work" means the hoisting, storage, application, and removal of roofing materials and equipment, including related insulation, sheet metal, and vapor barrier woik, but not including the construction of the roof deck.
Safety-monitoring system - means a safety system in which a competent person is responsible for recognizing and warning employees of fall hazards.
Self-retracting lifeline/lanyard - means a deceleration device containing a drum-wound line which can be slowly extracted from, or retracted onto, the drum under slight tension during normal employee movement, and which, after onset of a fall, automatically locks the drum and arrests the fall.
Snaphook - means a cormector comprised of a hook-shaped member with a normally closed keeper, or similar arrangement, which may be opened to permit the hook to receive an object and, when released, automatically closes to retain the object. Snaphooks must be the self-closing, self-locking keeper which remains closed and locked until unlocked and pressed open for connection or disconnection.
Steep roof- means a roof having a slope greater than 4 in 12 (vertical to horizontal).
Toeboard - mews a low protective barrier that will prevent the fall of materials and equipment to lower levels and provide protection from falls for personnel.
Unprotected sides and edges - means any side or edge (except at entrances to points of access) of a walking/working surface, e.g., floor, roof, ramp, or runway where there is no wall or guardrail system at least 39 inches (1.0 m) high*
Walking/working surface - means any surface, whether horizontal or vertical on which an employee walks or works, including, but not limited to, floors, roofs, ramps, bridges, runways, formwork and concrete reinforcing steel but not including ladders, vehicles, or trailers, on which employees must be located in order to perform their job duties.
Warning line system - means a barrier erected on a roof to warn employees that they are approaching an improtected roof side or edge, and which designates an area in which roofing work may take place without the use of guardrail, body belt, or safety net systems to protect employees in the area.
Work area - means that portion of a walking/working surface where job duties are being performed.
4.0 RESPONSIBILITY
All WRS employees and subcontractor employees covered by this SOP are responsible for complying with its contents. Supervisors are responsible for implementing and enforcing the SOP and securing the resouces necessary to implement it.
NYC-WTC_000145142
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000149537
Instructions and sections for collecting sample location data from a specific building interior.
22 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
20 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117441
Report from Athenica Environmental Services regarding HVAC and environmental inspections at 375 South End Avenue.
13 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117561
Cover letter from Athenica Environmental Services regarding HVAC and environmental inspections at 395 South End Avenue.
11 shared non-person entities · 1 shared topics · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
20 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164732
Draft spreadsheet of asbestos sampling results from residential locations collected November-December 2001, circulated for review.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139712
Series of emails forwarding a draft memo between DEP staff members for review and finalization.
17 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
12 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164784
Transmission of revised asbestos sampling results for residential samples collected November-December 2001.
15 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
25 shared non-person entities · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Cited alongside this record in an Ask answer
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.
Cited alongside this record in an Ask answer