riAY-20-2002 21:44 U.S. EPP/DEPP 212 6373772 P.03/09
Page 2 of2
afl systems. (As revealed during the Clinton/Lleberman hearings, the air systems at Stuyvesant were never done
• only tna outside of the ducts were cleaned • but a thorough cleaning 0^ an pipes leading from end to air system
were loft infected.)
4. Clean up of outsifle of buildings (roofs, walls, terraces} eimuleneously with the start of indoor cleanup.
WINDOWS AND WINDOW SIUS MUST BE INCLUDED IN THE INDOOR AND OUTDOOR CLEANUP.
(the proposal mentions air conditioners > the windows and window silis also have buildup which will come in the
minute the windows ere open.)
S. Clean up of a!l common areas in efl buildinss.
6. Clean up of streets and construction sites • beyr id the "wateririg down” methods. The streets/perksArees/grass
must be Cleaned... the sand removed from park playgrounds - and not replaced until the a.'ea is safe. The top soil
removed $0 topical toxins are taken away. The grass somehow should be dealt with > before people begin
lounging all over the grass in warm weather.
Sincerely,
Diane Lapson VP IPNTA
John Scott VP IPNTA
Independi'nee Plaza ronenl Acsocialion
</n/7nn7
NYC-WTC_000144814
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000144814Source: NYC Law Department, mirrored locally
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Joint announcement of a comprehensive plan by the EPA and city partners to address indoor air quality concerns in residential units south of Canal Street.
EPA Region 2 responds to a congressional inquiry about the joint EPA-DEP program for testing and cleaning lower Manhattan homes after the WTC collapse.